Ingeniería en Sistemas, Electrónica e Industrial
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1
Examinar
9 resultados
Resultados de la búsqueda
Item type:Ítem, Modelo de simulación para la optimización y resiliencia productiva en la empresa textil Tefy Tex.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial., 2026-07-06) ;Zamora Sailema, Jerami Amilcar ;Reyes Vasquez, John PaulUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial.This research project develops a discrete-event simulation model in FlexSim to verify system behavior and optimize resource management. Input data is obtained using work measurement tools to replicate the inherent conditions of the production system. In this context, small and medium-sized enterprises in the sector face growth constraints stemming from low adoption of technological tools, empirical planning, and reactive decision-making, which compromise their responsiveness. Three scenarios are evaluated, each with 20 replicates. The current scenario (S1) reveals bottlenecks in the drying subprocess, employee operational time utilization of 45,76%, machinery utilization of 27,52%, and an OTD of 0,66, demonstrating that the system has limited adaptability. On the other hand, the disruptive scenario (S2), which simulates increased demand with additional resources and extended working hours, reduced the OTD to 0,43, demonstrating that increasing the workforce does not resolve the structural constraint. The optimized scenario (S3) shows that operating with three employees in the overall process, a batch size reduced to 10 units, and extended hours increases operational time to 64,37% and machine utilization to 37,85%, achieving production levels comparable to (S1) but with two fewer employees. The results confirm that resilience and increased productivity are achieved through the logical synchronization of operational flow and not through the empirical oversizing of resources.Item type:Ítem, Balanceo de líneas para mejorar la productividad de la línea de confección textil en la Empresa Corporación Impactex Cia. Ltda.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial., 2026-01) ;de la Cruz Llundo, Diego Iván ;Sánchez Rosero, Carlos HumbertoUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial.The main objective of this project was to develop line balancing to improve the productivity of the textile apparel production line at Corporación Impactex Cía. Ltda. The first stage consisted of evaluating the current state, characterizing the processes, prioritizing Category A products and grouping them by production lines, and establishing reliable standard times through a time study. Based on this data, a cycle time of 15.66 seconds per unit was set. Subsequently, the Kilbridge and Wester (KWM) heuristic was applied for balancing, complemented by the multi-operator station method to efficiently manage tasks that exceeded the cycle time. Based on this balancing, a fictional sequencing for the global distribution of 12 stations was designed under the Mixed-Model Assembly Line Balancing Problem (MMALBP) approach, utilizing fixed and floating tasks. This redistribution was reflected in a U-shaped Layout, which significantly increases system flexibility. Finally, discrete-event simulation in FlexSim validated the proposal, demonstrating an average increase in line efficiency from 54% to 81% and a drastic reduction in idle time from 33%-45% to 10-11%. The throughput improved remarkably, highlighting an increase in production across the different lines by eliminating bottlenecks and significantly reducing Work in Process (WIP) inventory. The solution guarantees a continuous, stable, and highly efficient production flow, ensuring that the company's installed capacity optimally meets demand.Item type:Ítem, Distribución de instalaciones en la planta de procesamiento de frutas de la “Junta de Riego de la Acequia Mocha-Huachi”(2025-07) ;Villalba Córdova David Emanuel ;Naranjo Chiriboga Israel ErnestoUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería IndustrialThe fruit processing plant of the Junta de Riego de la Acequia Mocha-Huachi is inactive due to an inefficient layout. The aim of this study is to was to design a facility layout that would restore operability and will optimize the resource is use. The methodology includes data collection on equipment, usable area (193.21 m²), and supply capacity (5,160 kg/month), identifying the steam kettle as a bottleneck and establishing an installed capacity of 1,105 kg/day. Based on these data, the current layout is mapped, and two layout alternatives are generated using Guerchet’s dimensioning method and Systematic Layout Planning (SLP). The load-distance analysis and a qualitative matrix indicate that Alternative A, composed of 13 functional areas and requiring 124 m², is the most efficient (8,180.52 kg·m and 24 points) compared to Alternative B (8,472.48 kg·m and 16 points). The proposed layout satisfies the six layout principles by integrating operations, reducing travel distances, ensuring continuous flow, taking advantage of cubic space, enhancing safety and hygiene, and facilitating operational flexibility. Validation through FlexSim projects a pulp production of 165 kg per shift and a potential 108% increase in capacity, from 240 kg to 500 kg per day, without introducing new bottlenecks. This enables the structuring of a functional, orderly, and scalable production system aligned with the technical requirements of agro-industrial processing.Item type:Ítem, Diseño de la distribución de planta para mejorar los procesos productivos en la empresa Deportex(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-02) ;Inca Azas, Sebastián AlexanderOrtiz Sailema, Christian IsmaelThe purpose of this research is to propose a physical redistribution of the facilities of the company DEPORTEX. An integral proposal is presented to improve the operational efficiency, proposing a physical redistribution of the facilities. The importance of this study lies in resolving identified bottleneck in the ironing process, and improving the company's production capacity. To achieve these objectives, several procedures were used, such as time analysis, Guerchet's method for calculating the physical space required, SLP methodology for plant layout, FlexSim simulation and the application of WinQSB software. The results obtained revealed that the proposed redistribution generated a significant increase of 12.05% in monthly production, eliminating the need for overtime and generating an estimated monthly savings of $1068.96. This approach not only improves DEPORTEX's operational efficiency, but also optimizes resources and strengthens its competitiveness in the athletic hosiery manufacturing industry. The main contributions of these results include providing DEPORTEX with a practical strategy to improve its operational efficiency, effectively adapt to market demands, and improve its profitability. This research, by offering tangible solutions, contributes to the more efficient management of resources and to the company's ability to face the challenges of the industry successfully.Item type:Ítem, Estandarización y optimización de los procesos de producción en la empresa “Nutrisalminsa S.A.”(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2023-09) ;Rivera Lagua, Willian FabricioMorales Perrazo, Luis AlbertoOne of the problems in the manufacture of food supplements for farm animals is the non-standardisation of production processes that generates effects such as: defective products, reprocesses, unproductive activities, bottleneck, among others; therefore, the objective of the research is to develop the standardization and optimization of production processes in the company "NUTRISALMINSA S.A.". The study was carried out by means of descriptive research, comprising three stages: I. Analysis of the processes, which identified the current situation of the plant by means of flow diagrams, characterization and time study. II. Determination of the level of deficiency by means of key production indicators. III. Simulation of the manufacturing processes to improve productivity. The results of the research showed that there are activities that do not add value and that restrict production by 12.88%; this situation leads to a bottleneck in the bagging area, with a time of 1862.27 seconds which corresponds to a decrease in production, the level of deficiency in the study level corresponds to 15.90%, in addition, the effectiveness in the study period was 97.79%, while its efficiency was 84.10%, highlighting the lack of optimization of resources and production processes. The simulation in FlexSim forecasts an improvement of 15 units per day, with the optimized times and standardized activities in the production in a schedule of 8 working hours, which is equivalent to 1215 US dollars. The standardization and optimization of the production processes is also visualized with the modification or elimination of activities that do not add value to the process. It is concluded that the company Nutrisalminsa S.A. has improvement opportunities to increase its productivity through standardization and optimization of its production processes, which can have an impact on additional economic income and the reduction of its production deficiency.Item type:Ítem, Estudio de tiempos y movimientos para la optimización del proceso de producción de yogur en la empresa pasteurizadora Nutrición y vida S.A”(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2022) ;Orozco Vásquez, Cristian JavierOrtiz Sailema, Christian IsmaelThis research project arises with the need to improve the process of making yogurt, the general objective is based in realize a study of times and movements for the optimization of the production process of the product with the highest demand in the company "Pasteurizadora Nutrición y Vida S.A", the ABC methodology was used to determine the star product. The product with the highest demand in the production line is the yogurt in bottle of 4-liter Strawberry flavor, with the time study it was identified that the process that slows down the production line is lactic fermentation, which limits the company's production capacity to 99 units per day; for the movement study, the bimanual diagram was applied, which reduced a total of 11 non-efficient movements. In addition, an improvement proposal was made which deals with a plant redistribution applying the SLP method, also the number of machines needed for each area was calculated in order to increase production capacity, the FlexSim tool was used to simulate the current and proposed situation. Finally, the results of the plant redistribution show a reduction from 559.48 to 342.75 meters was obtained, decreasing 38.75% in distance traveled, also an improvement of 0.60% was obtained in process time from 1544.47 to 1535.87 minutes. 87 minutes, subsequently it was determined that one more machine is needed in the fermentation area, by simulating these results a production of 3500 units/month was obtained, comparing the current production vs. the improvement represents an increase of 1280 units which corresponds to an increase of 57.66% in production and a growth in monetary value equivalent to $3456.00.Item type:Ítem, Mejora de la productividad en la línea de producción de tela kiana de la empresa textil “M&B” aplicando tiempos y movimientos(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2023-03) ;Rodríguez Panata, Sara RebecaOrtiz Sailema, Christian IsmaelThe production processes related to the manufacture of fabrics are closely linked to the use of machinery, labor, resources and inputs to produce the final product. However, the empirical way in which Textiles M&B has grown, has caused that there is no standard time of operations and much less documented procedures for operators to know how to perform their activities, causing unnecessary waiting, transportation and movements in the production line of Kiana fabric. The purpose of this research is to improve the productivity levels of Kiana fabric. The study includes the analysis of the stages of the production process, with respect to the evaluation of the work rhythm through the Westinghouse system, the assignment of supplements according to the criteria of the International Labor Organization, t he measurement or timing of the activities, to determine the standard time of the processes and based on that to apply improvements that allow to increase the production of Kiana fabric based on the elimination of unnecessary movements, transports and wait s in the production process. The results show that by applying the 5S and SMED methodologies, the production process is improved by 3.04%. The new work methods are embodied in a procedures manual to standardize operations. Finally, it is concluded that productivity levels increase by 44.62% with the proposals established to improve the production process.Item type:Ítem, Análisis de la metodología lean manufacturing para mejorar el proceso de faenamiento en el Camal Frigorífico Municipal de Ambato (CFMA)(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2023-03) ;Córdova Montero, Danny JavierGavidia García, José LuisThe activities that do not generate value, cause waste that may be present in the processes and that affect productivity, therefore, this research project focuses on the development of an analysis of the Lean Manufacturing methodology in the process of slaughtering pigs of the Camal Refrigerófico Municipal de Ambato (CFMA), since, the company does not have tools that allow it to diagnose, reduce or eliminate unproductive activities. The research has a quantitative approach, based on the calculation of numerical variables with the application of diagnostic, operational and monitoring tools of the Lean Manufacturing methodology. An initial diagnosis of the process was made, with the collection of information, using Industrial Engineering tools such as: process diagram and analytical course, describing activities, machines and inputs. A time study was developed to identify abnormalities of each process, by determining the number of samples by General Electric and timing of the activities with the back to zero method, to design a current VSM as a Lean Manufacturing diagnostic tool identifying: the activities, the times that add value and not to the process Waste was determined as: censing movements, incorrect waiting and processes, in addition, the potential causes of waste, to propose solutions with the operational tools, proposed as: 5S for the order and cleanliness of the areas, eliminating activities that do not add value to the process, and standardization to propose the reduction of incorrect processes based on work instructions and simulate them in the FlexSim 2019 program. It is concluded that the process has 30.35% of activities that do not add value to the process and affect productivity. Therefore, the process does not meet the company's specifications and improvement actions are required.Item type:Ítem, Redistribución de instalaciones para la mejora de la productividad en la planta de producción de la empresa Calzado Gusmar(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2023-03) ;Játiva Amores, José PaúlNaranjo Chiriboga, Israel ErnestoThe purpose of this research is to present a proposal for the physical redistribution of the facilities within the footwear company GUSMAR, this proposal allows to improve the productivity of the plant, removing useless distances and optimizing the available space. For the development of the project, three fundamental stages were considered: in the first stage, information was gathered on the current conditions of the production process; in the second stage, tools and methodologies for the distribution of facilities were used; and finally, the model of the current distribution and the proposed distribution were simulated using FlexSim software, in order to compare and select the alternative that would increase productivity. To generate the redistribution alternatives, the systematic distribution planning (SLP) method was used, then two alternatives were proposed and evaluated by means of the load-distance analysis, where it was determined that alternative 2 is optimal, since it reduces the distance traveled by the material by 26.75%, equivalent to 91,014.80 meters. And with the objective of reducing the longest duration times in the processes of trimming and assembly (bottleneck) where a flexible distribution in those workstations was carried out The distribution proposal was validated by analyzing the indicators obtained in the FlexSim software simulation of the entire footwear manufacturing line, where it was shown that this proposal generates an increase in productivity of 0.06%, or the same from 0.63 to 0.67 pairs/hour of work, or the increase from 625 pairs of shoes to 667, without generating an additional cost by redistributing the facilities of the GUSMAR footwear production plant.
