Ingeniería Mecánica
Permanent URI for this collectionhttp://repositorio.uta.edu.ec/handle/123456789/900
Browse
3 results
Search Results
Item Desarrollo de un plan de mantenimiento para la línea de producción de la empresa productora lácteos San José de la ciudad de Píllaro, basado en la metodología de mantenimiento productivo total (TPM)(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2023-01) Castro Pico, Jason Daniel; López Velástegui, Jorge EnriqueDue to the need to improve production, this project allowed the development of a plan based on the methodology of Total Productive Maintenance TPM for the company Productos Lácteos San José in the city of Píllaro, information was collected which was provided by management and staff working in the company who collaborated in the collection of technical data of the machines involved in the research. In the development of the project, a diagnosis of the current situation of the company was elaborated, then for the consolidation and development of the Total Productive Maintenance TPM were made: technical data sheets of the equipment, environmental and safety suggestions for the operators, machine weighting tables, inventory of equipment and machines, interviews for the collection of information, as well as training through information campaigns detailing the model of the plan to be implemented in the company, In addition, Excel spreadsheets of Failure Mode Analysis "FMEA", Criticality Matrix, global effectiveness analysis and ending with the elaboration of the Maintenance Ranges, a statistic according to the need of each equipment and the application of the 5 "S" within the company taking into consideration the criteria described with the participation of the personnel of each area were elaborated.Item Desarrollo de un plan de mantenimiento preventivo mediante el método TPM para el area de producción en las secciones de inyección de la empresa Halley corporación C.L(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2022-08) De la Cruz Chamba, Jairo Wladimir; Castro Miniguano, Christian ByronThis technical project was taken into account to meet the needs of the company "HALLEY CORPORACION C.L." which consists of improving the maintenance activities of the plastic injection machines which collaborate in the production of different types of products which are generated within the company, for the elaboration of the project it was necessary to develop an approach based on reliability to later be able to develop the different maintenance activities. In order to identify the different failures that may exist in the machines, the NTP 679 standard has been used, which provided us with information on the analysis of failures in its different parts, for the analysis by the Weibull method, the NTP 331 standard has been used. which helped us determine the time of good operation. Finally, the final product of the project presents us with an annual maintenance plan which is distributed in 6 ranges which indicate the preventive maintenance activities to be carried out in the different systems that make up the plastic injection machines which are in a stage child support.Item Desarrollo de un plan de mantenimiento basado en el mantenimiento productivo total (TPM) para el sistema de captación, conducción y casa de máquinas en la central hidroeléctrica Río Verde Chico(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2021-01) Casco Andrade, Christian Andrés; López Velástegui, Jorge EnriqueThe present project determined a mechanical maintenance plan based on the TPM for the catchment, conduction and machine house system at the Río Verde Chico hydroelectric plant of the company HIDROSIERRA SA, in the city of Baños de Agua Santa, the development of the plan maintenance began with the collection and information gathering of the mechanical elements that intervene in the three systems previously obtained for the subsequent obtaining of technical sheets of each mechanical element and their respective coding. The constant titling work with five of the twelve steps established by the Japanese Plant Maintenance Institute (JIPM) for the implementation of Total Productive Maintenance (TPM), in addition to obtaining the preventive maintenance ranges, techniques established by the Reliability Centered Maintenance (RCM), such as Modal Failure and Effects Analysis (AMFE) and Criticality Analysis (CA), all for the generation of the maintenance plan. In addition, it includes the 5 “S” strategy, named after its initials in Japanese, the implementation of this strategy began with the identification and classification of elements, by means of the red labeling, the useful elements were relocated in the storage areas and for the non-useful elements were delivered to the qualified managers for their purpose or, in the case of garbage, to the garbage collectors controlled by the Illustrious Municipality of Baños, with the application of this strategy, we sought to create a cleaner, more orderly work environment and sure.