Ingeniería en Sistemas, Electrónica e Industrial
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1
Examinar
6 resultados
Resultados de la búsqueda
Item type:Ítem, Distribución de instalaciones en la planta de procesamiento de frutas de la “Junta de Riego de la Acequia Mocha-Huachi”(2025-07) ;Villalba Córdova David Emanuel ;Naranjo Chiriboga Israel ErnestoUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería IndustrialThe fruit processing plant of the Junta de Riego de la Acequia Mocha-Huachi is inactive due to an inefficient layout. The aim of this study is to was to design a facility layout that would restore operability and will optimize the resource is use. The methodology includes data collection on equipment, usable area (193.21 m²), and supply capacity (5,160 kg/month), identifying the steam kettle as a bottleneck and establishing an installed capacity of 1,105 kg/day. Based on these data, the current layout is mapped, and two layout alternatives are generated using Guerchet’s dimensioning method and Systematic Layout Planning (SLP). The load-distance analysis and a qualitative matrix indicate that Alternative A, composed of 13 functional areas and requiring 124 m², is the most efficient (8,180.52 kg·m and 24 points) compared to Alternative B (8,472.48 kg·m and 16 points). The proposed layout satisfies the six layout principles by integrating operations, reducing travel distances, ensuring continuous flow, taking advantage of cubic space, enhancing safety and hygiene, and facilitating operational flexibility. Validation through FlexSim projects a pulp production of 165 kg per shift and a potential 108% increase in capacity, from 240 kg to 500 kg per day, without introducing new bottlenecks. This enables the structuring of a functional, orderly, and scalable production system aligned with the technical requirements of agro-industrial processing.Item type:Ítem, Distribución de instalaciones en la planta de producción de la empresa Ecuatoriana de Autobuses Altabuss Cia. Ltda.(2025-07) ;Altamirano Jaramillo Jorge Mateo ;Naranjo Chiriboga Israel ErnestoUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería IndustrialPlant layout is a key element in industrial engineering, as it aims to efficiently organize physical resources to optimize material flow, reduce non-productive time, and improve productivity. In this context, the production plant of the company Ecuatoriana de Autobuses Altabuss Cía. Ltda., dedicated to the manufacturing of bus bodies, was designed with the objective of improving operational efficiency and complying with current regulations. For the diagnosis and the proposal, tools such as Systematic Layout Planning (SLP), relationship matrices, route diagrams, simulation with FlexSim, and line balancing through POM-QM were used, based on times obtained from method and time studies. Additionally, various matrices were applied to assess organizational, operational, and regulatory aspects of the current situation. Two layout alternatives were evaluated; Proposal 1 showed better results by reducing travel distance by 727.3 meters, requiring less built area, and facilitating supervision and rework processes. Although both proposals showed similar time performance, Option 1 demonstrated spatial, operational, and economic advantages. The design allowed for increased production capacity: after an initial stabilization period of 24,500 minutes (51.04 working days), a stable production rate of one bus every 4,585 minutes (10 days) was achieved, enabling a total output of four units per month. Finally, although the regulatory evaluation was applied to the current situation, the new proposal was developed considering the criteria identified in that analysis, thus meeting the requirements of Executive Decree No. 255 on occupational health and safety.Item type:Ítem, Distribución de instalaciones para la empresa Vinos D. Diaz(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-08) ;Labre Yugcha, Melida AbigailNaranjo Chiriboga, Israel ErnestoThe present research entitled "Distribution of facilities for the company D. Diaz wines" is focused on solving the problem of inefficient distribution of facilities, which generates excessive travel distances and interrupted work flow. The main objective of this work is to design a plant layout that optimizes the use of space, reduces travel distances and improves production flow in the new facility. To achieve this objective, a methodology is employed that includes an initial diagnosis of the current facilities, data collection through direct observation, interviews as well as time and activity analysis. The dimensions and characteristics of the spaces needed for each production area are evaluated, using software such as AutoCAD and FlexSim to simulate and analyze the proposal. The main results of this research reveal that the proposed layout of the facilities, validated by means of a simulation model, achieves a significant reduction of the distances traveled and the elimination of intersections in the production process. These changes significantly improve the production flow, reducing the distance traveled by 67.22% and increasing the operational efficiency in its production capacity to 6,000 bottles per year. In conclusion, the implementation of the new distribution model, analyzed through simulation in FlexSim, significantly optimizes the use of space in the plant and ensures a continuous production flow.Item type:Ítem, Distribución de planta con manufactura esbelta en las instalaciones de Elohimtex Cía. Ltda.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-02) ;Soria Tomaico, Shirley VanessaTigre Ortega, Franklin GeovannyThis research project is based on proposing a distribution of facilities with a lean approach in the company Elohimtex Cia Ltda. The consideration of an efficient distribution makes the performance of the organization count with an improvement in productivity and optimization of resources. For the development of the proposal, the application of two strategic approaches, the SLP methodology and manufacturing cells, is approached. The techniques considered within the parameters of lean manufacturing are the value stream map, to analyze the current and proposed state; and Kanban cards that allow efficient control within production; each tool is intended to replace activities that do not generate value to the product to be developed and eliminate possible waste. To contemplate how beneficial the stipulated proposal could be, a simulation was carried out using FlexSim. When comparing the results of the current situation with the proposal, a 32% reduction in distance traveled is estimated. With these data identified through the simulation, it is evident that the proposal considered has important benefits within the elaboration of products in the organization, making that the processing times have a significant reduction.Item type:Ítem, Distribución de instalaciones para la mejora del sistema de almacenamiento en la bodega de materias primas de la empresa de calzado Gamo´s(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2022-09) ;Calderón Castillo, Washington AlfonsoNaranjo Chiriboga, Israel ErnestoThe problem arises from the need to have a distribution of facilities that provides adequate spaces, properly distributed areas and a storage system according to the requirements of the company, since the current distribution of facilities is not adequate and generates problems in the logistic processes of storage. For the development of the project, the methodology of logistics diagnosis of warehouses and distribution centers was used to identify the current conditions of the warehouse, obtaining as a result deficiencies in floor quality, lack of loading-unloading docks, inadequate distance between aisles and lack of indicators, triggering problems in the processes of reception, storage and dispatch of raw materials, likewise, a categorization of products was made based on the level of consumption and analyzing the criticality of raw materials, identifying the most critical materials thanks to the use of tools such as: ABC, BOM and criticality matrix. On the other hand, the PRISMA methodology was used to obtain applicative criteria related to storage principles and distribution techniques that allowed the design of a new distribution of facilities with which a reduction of about 3,000 meters is foreseen, limiting internal movements by applying a heuristic allocation method. The estimated investment for the implementation is US$59.758,56 and an annual saving of US$1.779,32 is estimated, which represents 2.98% of the total investment, allowing a recovery of the investment in 33,6 months. Finally, the results are corroborated through the simulation of the storage logistics processes using FlexSim software.Item type:Ítem, Distribución de instalaciones para la nueva planta de producción de la empresa de Calzado CASS(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2020-01) ;Yuccha Cuno, Edgar AníbalNaranjo Chiriboga, Israel ErnestoEl trabajo de investigación tiene como finalidad la presentación de una propuesta de distribución de instalaciones para la nueva planta de producción de la empresa de calzado CASS, propuesta que es rentable y de gran utilidad al permitir evaluar los principales factores que afectan a la productividad como las grandes distancias recorridas e inadecuado uso del espacio. Para el proyecto se considera tres etapas, el levantamiento de la información del proceso productivo actual, aplicación de técnicas de distribución de instalaciones y toma de decisiones con una herramienta multicriterio. La generación de alternativas de distribución se llevó a cabo empleando el método SLP el cual emplea una visión cualitativa del problema; para la validación de la primera disposición física, se utilizó el método carga distancia permitiendo tener un resultado más técnico. Con la ayuda del software WinQSB especializado en resolución de problemas de la investigación operativa se genera una segunda alternativa de distribución tomando en cuenta las mismas restricciones físicas. En apoyo a la determinación de la distribución que brinde la mayor eficiencia para el proceso productivo, se optó por analizar ambas alternativas a través del proceso analítico jerárquico como técnica multicriterio para la toma de decisiones en el entorno del software Expert Choice. La propuesta de distribución se enmarca en el interés de diseñar una nueva disposición física con un criterio técnico y sustento tecnológico, por lo que el presente proyecto obtuvo ahorros considerables alcanzando una disminución de 232,50 metros en la distancia total recorrida, lo que equivale a 5,17 minutos menos en el tiempo total de fabricación. he work of investigation has as purpose the presentation of a proposal of distribution of facilities for the new plant of production of the company of footwear CASS, proposal that is profitable and very useful when allowing of evaluating the main factors that affect the productivity as the great whole ranges and inadequate use of the space. For the project one considers three stages, the rise of the information of the present productive process, application of techniques of distribution of facilities and decision making with a tool multicriterial. The generation of distribution alternatives was carried out using the method SLP which uses a qualitative vision of the problem; for the validation of the first physical disposition the method was used loads distance allowing to have a result more technician. With the aid of software WinQSB specialized in resolution of problems of the operations research one second alternative of distribution is generated taking in account the same physical restrictions. In support to the determination of the distribution that offers the greater efficiency for the productive process, it was chosen to analyze both alternatives through hierarchic analytical process as technical multicriterial for the decision making in the surroundings of software Expert Choice. The distribution proposal is framed in the interest to design a new physical disposition with a technical criterion and technological sustenance, reason why the present project obtained considerable savings reaching a diminution of 232.50 meters in the crossed total distance, which is equivalent less to 5.17 minutes in the total time of manufacture.
