Ingeniería Civil y Mecánica
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898
Examinar
9 resultados
Resultados de la búsqueda
Item type:Ítem, Diseño del alcantarillado sanitario y pluvial del caserío Sigsipamba de la parroquia de Picaihua del cantón Ambato provincia de Tungurahua etapa 2(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil., 2025-02) ;Cruz Andrade, Jeycob IsraelGuevara Robalino, Jorge JavierA sanitary sewer system is considered an essential service for the population due to its impact on people's health and hygiene, while a storm sewer system does not help prevent flooding and natural disasters. Despite this, in the Picaihua parish, Ambato canton, Tungurahua province, there are many sectors that lack this service. Because of this, the objective of this technical project is to design the sanitary and storm sewer system, including its treatment plant, for the Sigsipamba hamlet. The methodology used in this project was in several phases: in the first phase, the design parameters were determined, which provide us with technical values and criteria to size and plan our project, and the obtaining of data, which includes the topographic survey, which provides us with georeferenced points of our project. Subsequently, the design of the sanitary, storm sewer and PTAR was carried out in accordance with the Bolivian standard NB 688 and the current regulatory framework of Senagua. In the final phase, a unit price analysis of the project was carried out, which gives us an approximate value of the construction cost of the project. The result was a sanitary and storm sewer network of 26 wells and 25 pipes for both the sanitary and storm sewers with a length of 972.32 m, and a flow rate of 11.94 lt/sg and 490.65 lt/sg respectively. As for the wastewater treatment plant, the following were obtained: an inlet channel, grate, sand trap, septic tank, in addition to the drying bed and the ascending flow biological filter, which meet the established parameters. Finally, the Unit Price Analysis of the project was determined, which is the value of five hundred and fifty-five thousand one hundred and thirty-one US dollars and seventy-four cents.Item type:Ítem, Evaluación del funcionamiento de la planta de tratamiento de aguas residuales del sector Tres Esquinas de la parroquia Presidente Urbina, perteneciente al cantón Santiago de Píllaro, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-03) ;Culqui Llamuca, Giovanna LissetteGuevara Robalino, Jorge JavierAt present, a serious environmental impact has been observed due to the discharge of wastewater without prior treatment or without adequate sanitation, in order to know if the wastewater treatment plant (PTAR) in the Tres Esquinas sector currently works correctly or has reduced its efficiency in the removal of contaminants, an information survey was carried out in the field, where the maximum flow rates at the entrance and exit of the plant were determined, resulting in 2.40 liters/sec in the tributary and 2.02 liters/sec in the effluent, and thus obtain residual water samples for subsequent laboratory analysis. With the laboratory results and their respective dimensions, the operation of the plant components was evaluated, which are: flow distribution tank, septic tank, ascending flow anaerobic filter (FAFA) and sludge drying bed, demonstrating in mostly the correct operation of the WWTP compared to design manuals; adding that the values of the parameters of the wastewater effluent are less than the maximum values stipulated in the TULSMA 2015 standard. As a result, and to improve the performance of the WWTP, a resizing of the septic tank is proposed, the only component that did not comply with the sizing based on the RAS 2000 standard, additionally an operation and maintenance plan for it is presented, the design of an enclosure and a cover for the sludge drying bed with their respective plans and referential budget.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la comunidad Mochapata, parroquia Yanayacu, cantón Quero, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-09) ;Herrera Narváez, Erick SantiagoSilva Tipantasig, Lenin GabrielThis experimental work is based on the evaluation of the wastewater treatment plant (WWTP) of the Mochapata community, to determine if the treated water that is discharged into the Mocha River complies with the TULSMA 2015 standard. For this, it began with a survey of information, such as: location, socioeconomic activities of the population and a diagnosis of the treatment units; a field investigation was carried out, where the measurement of the influent and effluent flows was carried out, also a sampling of the residual water inlet and outlet of the WWTP for its subsequent laboratory analysis of its physical and chemical properties. Once the analysis has been carried out, the results obtained are compared with the discharge limits to freshwater, established by the TULSMA standard, where it was determined that six of the ten parameters analyzed do not comply with the regulations, including: oils and fats, biochemical oxygen demand (BOD5), chemical oxygen demand (COD), suspended solids, surfactants, and fecal coliforms. For this reason, it is necessary to look for an alternative to comply with the limits mentioned. The current treatment train was evaluated and, since it did not obtain an acceptable efficiency in the removal of contaminants, it was necessary to propose a new treatment train that guarantees the removal of contaminants below the permissible limits, it is composed of screens, grease trap, septic tank, trickling filter, sludge drying bed and artificial wetland.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la comunidad Rumipamba, parroquia Rumipamba, cantón Quero, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-09) ;Villacis Villacis, Myriam AndreaSilva Tipantasig, Lenin GabrielIn the present experimental work, an Evaluation of the PTAR was carried out in order to verify if it complies with the standards of functionality and efficiency in its processes. The initial works carried out in the treatment plant of the Community began with a tour of the site where the current facilities were known and inspected, then began with a topographic survey that revealed the current state of the treatment plant, for this process a drone was used for the respective aerial photo and a total station to raise the information of the system. Once the field work was finished, the measurement of both inlet and outlet flows was carried out using the volumetric method, during the 7 days for two weeks, in order to determine the day with the highest influx and to know the maximum and minimum flows with which the WWTP works. Once the effluent measurement intakes were completed, the sampling of the inlet and outlet flows was carried out, which were sent to be analyzed in the laboratories of the UNACH, knowing the result of the analysis parameters, we proceeded to compare the polluting loads that are treated in the plant with the parameters of permitted discharge of wastewater in freshwater bodies.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la comunidad Hualcanga San Luis, cantón Quero, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-06) ;Benalcázar Aguas, Emilio AndrésMorales Fiallos, Fabián RodrigoThe purpose of the present work was to evaluate the current operation of the wastewater treatment plant in the community of Hualcanga San Luis, Quero canton, Tungurahua’s province. For this purpose, an inspection of the facilities was made, and then the inlet and outlet flow rates were measured using the volumetric method for seven consecutive days. This made it possible to determine the maximum and minimum flows with which the WWTP works. Once these flows were measured, wastewater samples were taken. These samples were sent to the Environmental Services Laboratory of the UNACH´s University for analysis of the pollutant load. The results showed that the current processes: distribution tank, septic tank, sludge drying bed and ascending biological filter do not meet the maximum removal parameters established in the TULSMA 2015 standard. Once the current operation of the WWTP was evaluated, a redesign of the current stages and the design of new stages were carried out, which are: desander and an oil and grease trap. These improvements together with the redesigned stages will allow the plant to operate correctly, respecting the values allowed by the regulations, because at present the discharge of these waters is a source of pollution for the environment. Finally, a maintenance and operation plan was proposed to ensure that the WWTP functions optimally.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la parroquia Moraspungo, cantón Pangua, provincia de Cotopaxi(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-03) ;Carrasco Lozada, David SebastiánMaldonado Narváez, Lenin RafaelThe purpose of this experimental work was to evaluate the operation of the wastewater treatment plant built on the banks of the Piñanato River. To begin the evaluation work, the necessary information was gathered, such as the socioeconomic activity of the population of Moraspungo, the location of the WWTP, the area it occupies, the population it serves, the treatment units of the WWTP, among others. Subsequently, an in situ work was carried out starting to measure the treatment units, the gauging of inflow and outflow through the volumetric method to determine the day and time of the most critical scenario, and take samples, which in the laboratory analysis showed results that some physical-chemical parameters do not comply with the provisions of the TULSMA standard for discharges into freshwater bodies, especially the following two parameters: Surfactants and True Color. Once all the necessary data had been collected and all the theoretical sizing calculations for each of the treatment units had been made, it was deduced that the FAFA was not working properly, in addition to the evidence of cracks in the septic tank.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la parroquia San Andrés, cantón Píllaro provincia Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-03) ;Tamay Chiluiza, Karina BelénNúñez Aldás, Galo WilfridoIn the present experimental work, the evaluation was carried out in order to determine if the treated water that is discharged into the river complies with the TULSMA 2015 standard, which is why it began with the gathering of the information of the entire sector where the PTAR; Data collection on the effluent and effluent flows was carried out, the residual water was sampled at the entry and exit points to the PTAR for the analysis of the physical-chemical characteristics that were processed in a laboratory. Subsequently, a comparison was made with the water discharge parameters established by TULSMA 2015 where it was possible to verify that the Biochemical Oxygen Demand (DBO) and the Chemical Oxygen Demand (DQO) do not comply with the provisions of current regulations, for so it was decided to look for a proposal that would allow to improve the mentioned parameters. With the results obtained, an analysis was carried out according to the degree of actual removal to perform a recalculation of its geometric properties in order to give a definitive diagnosis of the current state of the PTAR and it was found that they allow to improve the BOD and COD of the water treated before final discharge, which includes: screening, sand trap, inhoff tank, trickling filter, fafa, sludge drying bed and a disinfection plant. Additionally, an operation and maintenance plan was implemented that efficiently fulfills the purpose for which said PTAR was designed.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la comunidad de Puñachizag, cantón Quero, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2021-09) ;Criollo Espín, Ricardo AlexanderCastro Solorzano, Fidel AlbertoThe main objective of this research is to determine if the plant is operating optimally. The evaluation of the community WWTP began with the gathering of information, a field investigation which was used to take dimensions, inflow flows to determine the design flow to be used. Wastewater samples were also taken, which were analyzed by an accredited laboratory and whose results were compared with the limit parameters established by the TULSMA 2015 regulation for wastewater discharges into freshwater bodies, where it was found that the parameter oils and fats does not comply with the standards, which showed that the WWTP is not working properly. Finally, a diagnosis was made of each of the current treatment processes, where it was found that some of its structures, such as the septic tank, do not meet the criteria and recommendations established in the design manuals. For the reasons mentioned before, it is proposed to incorporate a new treatment process (fat trap) to treat the high value of that parameter. Also, to carry out a structure redesigns that now, currently do not comply with the standards, and finally to incorporate an operation and maintenance plan to ensure the correct operation of the WWTP through the time.Item type:Ítem, Evaluación de la planta de tratamiento de aguas residuales de la parroquia Poatug, cantón Patate, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2020) ;Izurieta Pazmiño, Víctor HugoMaldonado Narvaez, Lenin RafaelIn the present experimental project, the Evaluation of the Wastewater Treatment Plant (WWTP) located in Poatug Parish of the Patate City in Tungurahua province was carried out with the objective of verify whether it is fulfilling the purpose for which it was built properly. The evaluation of the WWTP of the Poatug Parish began with a research of information of the WWTP of this current state. The flow of residual water is determined both at the entrance and at the exit of the WWTP and the important hours in which greater and lesser amount of residual water enters the WWTP during the day. In addition, a sample of the wastewater from the WWTP was conducted, which was analyzed in a certify laboratory in order to determine the contaminant load that is treated in the plant and compare with the parameters for wastewater discharges in rivers established in the TULSMA 2015. The current treatment process was evaluated (primary sedimentation, septic tank, Anaerobic Upstream Flow Filter and sludge drying bed) used to remove contaminants present in the incoming wastewater and it is found that it only removes approximately 40% of contaminants, which indicated that the WWTP is not working properly. On the other hand, it was found that several of its hydraulic structures are not maintained with the parameters established in the design manuals of the treatment plants. Finally, it is proposed to incorporate a new treatment process (inlet box, screening, sand trap, Anaerobic Upstream Flow Filter and sludge drying bed) so that the wastewater treated in the WWTP theoretically removes about 90% of the contaminants in an efficient way. On the other hand, an Operation and Maintenance Plan proposed so that the WWTP will have a proper functioning.
