Optimización de la geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 0+000 – 4+875 perteneciente a la provincia Tungurahua
dc.contributor.advisor | Aldás Sánchez, Milton Rodrigo | |
dc.contributor.author | Yanchaguano Sanchez, Jenny Maribel | |
dc.date.accessioned | 2025-03-07T22:46:39Z | |
dc.date.issued | 2025-02 | |
dc.description | Ante las dificultades de transporte que enfrentan los habitantes de la parroquia San Andrés, este proyecto propone mejorar sustancialmente la infraestructura vial de esta zona. Al optimizar la vía que conecta el puente Yanayacu con Píllaro entre las abs 0+000 hasta 4+875, se facilitarán las actividades productivas y turísticas, generando nuevas oportunidades de desarrollo para el sector de Tungurahua. El proyecto se estructuró en tres fases principales. La primera correspondió a los estudios preliminares, que incluyeron trabajos de campo como el levantamiento topográfico y el conteo vehicular para la determinación del TPDA de la vía. Posteriormente, en la segunda, se realizaron estudios de suelo, incluyendo ensayos destructivos y no destructivos, para caracterizar las propiedades físicas y mecánicas del suelo, así como también las deflexiones del pavimento. Por último, en la tercera con los datos obtenidos en las fases anteriores, se procedió a rediseñar la geometría de la vía, considerando el nuevo TPDA calculado, las características del suelo y las normas técnicas aplicables. En esta fase se definió el diseño horizontal, vertical y transversal, así como los demás elementos geométricos, además se elaboró un presupuesto que incluye todos los costos asociados a la construcción de la nueva vía, asegurando así la viabilidad del proyecto. El análisis topográfico reveló un terreno montañoso con pendientes pronunciadas, mientras que el estudio de tráfico clasificó la vía como clase I. Los ensayos de suelo indicaron un material arenoso limoso con un CBR de 19.18 por ciento apto para subrasante. Los resultados de las medidas de deflexiones con la viga Benkelman mostraron que el 89 por ciento de la longitud de la vía evaluada necesita reconstrucción. Con base en estos resultados se rediseñó la estructura del pavimento que fue compuesta por una carpeta asfáltica de 7.5 cm, una base de 15 cm y una subbase de 20 cm. Finalmente el presupuesto referencial calculado para este proyecto fue de 1´686,962.16 dólares. | |
dc.description.abstract | Given the transportation difficulties faced by the residents of the San Andrés parish, this project proposes to substantially improve the road infrastructure in this area. By optimizing the road that connects the Yanayacu bridge with Píllaro between sections 0+000 and 4+875, productive and tourist activities will be facilitated, generating new development opportunities for the Tungurahua sector. The project was structured into three main phases. The first phase corresponded to the preliminary studies, which included fieldwork such as topographic surveys and vehicle counts to determine the ADT of the road. Subsequently, in the second phase, soil studies were conducted, including destructive and non-destructive tests, to characterize the physical and mechanical properties of the soil, as well as the pavement deflections. Finally, in the third phase, using the data obtained in the previous phases, the geometry of the road was redesigned, taking into account the newly calculated TPDA, the soil characteristics, and the applicable technical standards. In this phase, the horizontal, vertical, and transverse design was defined, as well as the other geometric elements. Additionally, a budget was prepared that includes all the costs associated with the construction of the new road, thus ensuring the project's viability. The topographic analysis revealed a mountainous terrain with steep slopes, while the traffic study classified the road as class I. The soil tests indicated a sandy loam material with a CBR of 19.18 percent suitable for subgrade. The results of the deflection measurements with the Benkelman beam showed that 89 percent of the evaluated track length needs reconstruction. Based on these results, the pavement structure was redesigned, consisting of a 7.5 cm asphalt layer, a 15 cm base, and a 20 cm subbase. Finally, the estimated budget calculated for this project was $1´686,962.16 | |
dc.identifier.uri | https://repositorio.uta.edu.ec/handle/123456789/44177 | |
dc.language.iso | es | |
dc.publisher | Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil. | |
dc.subject | LEVANTAMIENTO TOPOGRÁFICO | |
dc.subject | TPDA | |
dc.subject | CBR | |
dc.subject | REDISEÑO | |
dc.subject | VIGA BENKELMAN | |
dc.title | Optimización de la geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 0+000 – 4+875 perteneciente a la provincia Tungurahua | |
dc.type | bachelorThesis |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- Tesis I.C. 2029 - Yanchaguano Sanchez Jenny Maribel.pdf
- Size:
- 25.85 MB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description: