Ingeniería en Sistemas, Electrónica e Industrial

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1

Examinar

Resultados de la búsqueda

Mostrando 1 - 3 de 3
  • Item type:Ítem,
    Planificación de la producción y capacidad en la empresa de inyección de plástico Halley Corporación C.l.
    (2025-07)
    Medina Palacios Luis Joffre
    ;
    Rosero Mantilla César Aníbal
    ;
    Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial
    The research project was carried out at HALLEY CORPORACIÓN C.L., a company dedicated to plastic injection for the manufacturing of products across three production lines. Currently, production planning is carried out without technical knowledge, leading to delays in deliveries and a reliance on overtime to meet customer requirements. The objective of this study was to develop a production and capacity plan to improve demand fulfillment and optimize the use of available resources. The methodology included selecting four representative products based on sales analysis, conducting time studies to determine production capacity, and using Excel to perform the necessary calculations and analyses. Based on historical data, demand was forecasted over an eight-month horizon using Forecast Pro software. An aggregate production plan was then developed using the level workforce strategy with overtime, resulting in a total cost of $11,588.73. Subsequently, a Master Production Schedule and a rough-cut capacity plan were created, revealing underloads in production processes and demonstrating that customer requirements could be met without adjusting capacity. This study concludes with the design of a production and capacity plan as a flexible tool for monthly or weekly demand scheduling, efficient resource allocation, and support for operational decision-making.
  • Item type:Ítem,
    Modelo de planificación de la producción y capacidad para la fabricación de cuero en la empresa Promepell S.A.
    (Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-08)
    Lara Miranda, Lourdes Amanda
    ;
    Naranjo Chiriboga, Israel Ernesto
    Promepell S.A., is facing production delays due to inadequate planning in its operational activities, resulting in the postponement of deliveries. The project aims to develop a model for production and capacity planning for the leather manufacturing processes in the footwear and upholstery production lines, enabling the company to fulfill customer orders according to established delivery dates. The methodology applied involved using Excel software for various calculations. Additionally, a time study was conducted as a basis for subsequent calculations, considering the products that the company primarily manufactures based on leather type and demand. A capacity analysis was also performed, focusing on necessary resources and demand forecasts. This analysis identified the bottleneck process that restricts production. A master production schedule was developed, indicating the required weekly production, and an approximate capacity plan was created to identify potential underloads or overloads in the processes, considering the available resources to meet future orders. With the production and capacity planning model, the company can determine daily production quantities, the processes to be carried out at each work center, the production hours, and the number of workers required for each process. This ensures better productivity through effective management and scheduling.
  • Item type:Ítem,
    Plan de producción para la optimización de recursos en una empresa artesanal de calzado
    (Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2022-03)
    Mejía Ocaña, Nathaly Monserrath
    ;
    Naranjo Chiriboga, Israel Ernesto
    The main objective of this research is to detail a proposed production plan in the artisanal footwear company Dy'Frans in Ambato city, in order to optimize resources and propose more profitable production strategies, using tools such as aggregate planning, master production plan (MPS) and production requirement plan (MRP). The project begins with a bibliographic search for topics of interest within production planning and tools related to industrial engineering for the evaluation and determination of the initial state of the company. Subsequently, we proceed with the calculation of the demand forecasts that are the basis for determining the production plan that best suits the company. The aggregate production plan corresponds to the first planning tool, which allowed evaluating seven production methods that can be implemented in the company, thus demonstrating that leveling capacity through overtime and variable workforce in the months with greater demand is the type of production that generates the lowest cost to the company. Within the proposal there is also the master production plan, the same one that assigns weekly units to be elaborated either in ordinary time and overtime. In addition, the handling of the quantity to be produced is determined by the lot-by-lot (LFL) rule. Finally, in the material requirement plan, most of the elements for the production of the 8084 model are shared in all its series with exception of the boxes, soles, pins and eyelets. For this reason, the MRP was prepared with 41 codes corresponding to materials and subunits of the shoe, resulting in a final cost of $ 13,299.70 that includes preparation costs, costs for supplier orders and immediate purchases, and costs for maintaining inventories.