Ingeniería en Sistemas, Electrónica e Industrial
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1
Examinar
15 resultados
Resultados de la búsqueda
Item type:Ítem, Modelo de simulación para la optimización y resiliencia productiva en la empresa textil Tefy Tex.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial., 2026-07-06) ;Zamora Sailema, Jerami Amilcar ;Reyes Vasquez, John PaulUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial.This research project develops a discrete-event simulation model in FlexSim to verify system behavior and optimize resource management. Input data is obtained using work measurement tools to replicate the inherent conditions of the production system. In this context, small and medium-sized enterprises in the sector face growth constraints stemming from low adoption of technological tools, empirical planning, and reactive decision-making, which compromise their responsiveness. Three scenarios are evaluated, each with 20 replicates. The current scenario (S1) reveals bottlenecks in the drying subprocess, employee operational time utilization of 45,76%, machinery utilization of 27,52%, and an OTD of 0,66, demonstrating that the system has limited adaptability. On the other hand, the disruptive scenario (S2), which simulates increased demand with additional resources and extended working hours, reduced the OTD to 0,43, demonstrating that increasing the workforce does not resolve the structural constraint. The optimized scenario (S3) shows that operating with three employees in the overall process, a batch size reduced to 10 units, and extended hours increases operational time to 64,37% and machine utilization to 37,85%, achieving production levels comparable to (S1) but with two fewer employees. The results confirm that resilience and increased productivity are achieved through the logical synchronization of operational flow and not through the empirical oversizing of resources.Item type:Ítem, Propuesta de rediseño de una línea de producción para la fabricación de un nuevo producto en la empresa Helados Rey de los Andes.(2025-07) ;Arias Córdova Alex Mauricio ;López Flores Mauricio XavierUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería IndustrialThe company Helados Rey de los Andes currently faces significant operational limitations due to the sustained increase in demand and the introduction of a new product: Helado tradicional de sabores. The existing production line exhibits structural inefficiencies, including long travel distances, disorganized workflow, and a freezing stage that constitutes a bottleneck, leading to product accumulation, idle times, and delays in the process. In its current state, the plant has a production capacity of approximately 5,000 units per month, which is insufficient to meet market requirements. To address this issue, a technical solution based on industrial engineering principles developed. This included time and motion studies, a layout analysis using the Systematic Layout Planning (SLP) methodology, and process simulation through specialized software. These tools enabled a precise diagnosis of the production system, the identification of critical points, and the design of a more efficient operational configuration. As a result of the redesign, a new plant layout proposed to optimize workflow, reduce operator travel distances, and enhance connectivity between key areas. Additionally, a new freezing unit incorporated exclusively for the new product, allowing an increase in monthly production capacity from 5,000 to 8,000 units. In conclusion, this technical intervention not only addresses the current market demands but also improves the operational performance of the plant and strengthens the company’s competitiveness in the medium term.Item type:Ítem, Distribución de instalaciones en la planta de producción de la empresa Ecuatoriana de Autobuses Altabuss Cia. Ltda.(2025-07) ;Altamirano Jaramillo Jorge Mateo ;Naranjo Chiriboga Israel ErnestoUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería IndustrialPlant layout is a key element in industrial engineering, as it aims to efficiently organize physical resources to optimize material flow, reduce non-productive time, and improve productivity. In this context, the production plant of the company Ecuatoriana de Autobuses Altabuss Cía. Ltda., dedicated to the manufacturing of bus bodies, was designed with the objective of improving operational efficiency and complying with current regulations. For the diagnosis and the proposal, tools such as Systematic Layout Planning (SLP), relationship matrices, route diagrams, simulation with FlexSim, and line balancing through POM-QM were used, based on times obtained from method and time studies. Additionally, various matrices were applied to assess organizational, operational, and regulatory aspects of the current situation. Two layout alternatives were evaluated; Proposal 1 showed better results by reducing travel distance by 727.3 meters, requiring less built area, and facilitating supervision and rework processes. Although both proposals showed similar time performance, Option 1 demonstrated spatial, operational, and economic advantages. The design allowed for increased production capacity: after an initial stabilization period of 24,500 minutes (51.04 working days), a stable production rate of one bus every 4,585 minutes (10 days) was achieved, enabling a total output of four units per month. Finally, although the regulatory evaluation was applied to the current situation, the new proposal was developed considering the criteria identified in that analysis, thus meeting the requirements of Executive Decree No. 255 on occupational health and safety.Item type:Ítem, Tiempo de atención al paciente en la unidad de consulta externa mediante la aplicación de Lean Healthcare(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-08) ;Navarrete Reinoso, Kevin GustavoTigre Ortega, Franklin GeovannyHealthcare services face the continuous challenge of optimizing patient care to ensure hospital efficiency and quality. This research project aims to optimize patient care time with a Lean Healthcare approach in the outpatient unit of the Hospital Básico Privado San Bartolomé. In response to this, the current situation was analyzed, detecting inefficiencies in patient flow management and task distribution, as well as high waiting room occupancy that affected the patient experience. Using ABC analysis, the most prevalent wastes were identified and depicted on a value stream map, highlighting issues such as waits, information handling, unnecessary movements, and defects. With the help of the weighted factors method, it was determined that the most suitable Lean Healthcare tools are standardized work and 5S. Subsequently, the current situation was simulated in FlexSim, revealing a high waiting time. To tackle this issue, a new simulation was used applying the standardized work tool. The results showed a reduction in waiting time of 12,91% the length of stay of patients decreased by 8,43% thus generating a decrease in waiting room occupancy. With the results obtained, it was considered that the proposal proves to be effective in optimizing patient care time in the outpatient unit, validating the importance of Lean Healthcare methodology to improve time management in the hospital.Item type:Ítem, Distribución de planta con manufactura esbelta en las instalaciones de Elohimtex Cía. Ltda.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-02) ;Soria Tomaico, Shirley VanessaTigre Ortega, Franklin GeovannyThis research project is based on proposing a distribution of facilities with a lean approach in the company Elohimtex Cia Ltda. The consideration of an efficient distribution makes the performance of the organization count with an improvement in productivity and optimization of resources. For the development of the proposal, the application of two strategic approaches, the SLP methodology and manufacturing cells, is approached. The techniques considered within the parameters of lean manufacturing are the value stream map, to analyze the current and proposed state; and Kanban cards that allow efficient control within production; each tool is intended to replace activities that do not generate value to the product to be developed and eliminate possible waste. To contemplate how beneficial the stipulated proposal could be, a simulation was carried out using FlexSim. When comparing the results of the current situation with the proposal, a 32% reduction in distance traveled is estimated. With these data identified through the simulation, it is evident that the proposal considered has important benefits within the elaboration of products in the organization, making that the processing times have a significant reduction.Item type:Ítem, Estandarización y optimización de los procesos de producción en la empresa “Nutrisalminsa S.A.”(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2023-09) ;Rivera Lagua, Willian FabricioMorales Perrazo, Luis AlbertoOne of the problems in the manufacture of food supplements for farm animals is the non-standardisation of production processes that generates effects such as: defective products, reprocesses, unproductive activities, bottleneck, among others; therefore, the objective of the research is to develop the standardization and optimization of production processes in the company "NUTRISALMINSA S.A.". The study was carried out by means of descriptive research, comprising three stages: I. Analysis of the processes, which identified the current situation of the plant by means of flow diagrams, characterization and time study. II. Determination of the level of deficiency by means of key production indicators. III. Simulation of the manufacturing processes to improve productivity. The results of the research showed that there are activities that do not add value and that restrict production by 12.88%; this situation leads to a bottleneck in the bagging area, with a time of 1862.27 seconds which corresponds to a decrease in production, the level of deficiency in the study level corresponds to 15.90%, in addition, the effectiveness in the study period was 97.79%, while its efficiency was 84.10%, highlighting the lack of optimization of resources and production processes. The simulation in FlexSim forecasts an improvement of 15 units per day, with the optimized times and standardized activities in the production in a schedule of 8 working hours, which is equivalent to 1215 US dollars. The standardization and optimization of the production processes is also visualized with the modification or elimination of activities that do not add value to the process. It is concluded that the company Nutrisalminsa S.A. has improvement opportunities to increase its productivity through standardization and optimization of its production processes, which can have an impact on additional economic income and the reduction of its production deficiency.Item type:Ítem, Estudio de tiempos y movimientos para optimizar los procesos productivos en la Corporación Impactex Cia. Ltda. del cantón Ambato(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2022-09) ;Gamboa Parra, Kleber FabianGavidia, José LuisThe main objective of this degree work is to propose an improvement proposal in the production line that manufactures the star product of the IMPACTEX corporation in the city of Ambato, a company dedicated mainly to the manufacture of intimate apparel for women, men and children. The research carried out had a quali-quantitative methodological approach, of a qualitative nature because direct observation was carried out to obtain informative data from the corporation, on the other hand, in the quantitative approach the star product was determined with an ABC analysis, then the times of each activity necessary for the manufacture of the product were taken and the critical area was determined where a study of times and movements was carried out, with which the flow of the raw material, the standard time and finally the production capacity of each activity was determined. With the standard time calculated for each activity, we proceeded to determine a proposal for improvement using engineering tools, unnecessary transports were eliminated in order to subsequently carry out a balance of assembly lines, where the effective times of each operator were balanced and production was maximized. As a result of the elimination of unnecessary transports, an improvement of 23% in the operating ratio was obtained, as for the balance of lines, an increase in production of 57 dozens of finished product per workday was obtained, with a balance in the production load of 35%, demonstrating the feasibility of implementing the proposed improvement. The data of the proposed improvement was validated using FlexSim simulation software, corroborating the benefits that would be obtained with the elimination of unnecessary transports and balancing the assembly line in the IMPACTEX corporation's apparel area.Item type:Ítem, Propuesta de distribución de instalaciones con perspectiva Lean en el taller industrial Shambi e hijos(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2022-09) ;Shambi Ortiz, Juan PabloNaranjo Chiriboga, Israel ErnestoThe plant layout is the way to properly locate machines, tools and workers to make the best use of the resources available to the industries. The main objective of this research project is to propose an adequate distribution of facilities for an industrial workshop dedicated to metalworking in different areas such as locksmithing, structuring and stainless steel, which is adapted to the production of the products offered by the workshop, reducing time and unnecessary transfers. In order to achieve these objectives, data is collected by means of information gathering techniques to know the current status of the company, its processes, products, etc., and then we proceed to obtain its star products and determine the standard time for each one of them. The appropriate type of distribution is selected with selection matrices and by means of the ordering and evaluation algorithms the appropriate distribution for the workshop is chosen, then the surface required for the distribution is established with the help of Guerchet's method and two alternatives are proposed, which are evaluated by means of the distance load method. By means of a selection matrix, the lean methodology tools are incorporated to the proposal, and with the help of the FlexSim simulation, the results obtained are compared between the current situation of the company and the proposed proposal. It is estimated that the time reduction is presented in 4.35% and the process routes in 69.87%, therefore, for this investment an investment of $22,080.00 is required with a recovery time of 1 year and 36 days.Item type:Ítem, Diseño de la infraestructura de una red 5g para la ciudad de Ambato(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería en Electrónica y Comunicaciones, 2022-09) ;Taipe Sailema, Gabriel MedardoJurado Lozada, Marco AntonioThe present project arises from the need to carry out a study of the new generation of mobile telephones "5G", analyzing in detail how this latest generation technology evolves the mobile telephony market allowing to have mobile broadband connections with high data rates it also discloses parameters necessary for the design of a 5G network. The different ways of implementing a 5G network will be analyzed by analyzing the type of cells that can be implemented in urban and rural areas as well as the joint coexistence of the 5G network with the currently deployed 4G. The different simulation software will be analyzed for the deployment of a 5G network in the city of Ambato, taking into account the minimum requirements of the simulation equipment to be able to observe a large part of the city with a 5G network deployed, as well as the choice of software analyzing its performance and performance characteristics compatibility.Item type:Ítem, Modelo paramétrico de fluidos para gases de combustión de un motor a gasolina extra(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Maestría en Física Aplicada, 2022) ;Gavilanes Sani, Jorge AnibalHidalgo Díaz, Víctor HugoThe present investigation is focused on the simulation of Computational Fluid Dynamics (CFD) of the combustion gases in an extra gasoline engine using the Ansys software. As a first step, the selection of the input parameters was carried out in order to investigate if they have any influence on the production of combustion gases such as carbon monoxide (CO), carbon dioxide (CO), nitrogen monoxide (NO), nitrogen dioxide (NO2) and unburned hydrocarbons (HNC). Once both the input and output parameters were selected, the levels of each input parameter were established in order to create treatments based on the experimental design (DOE) and building a 3 factorial design with a total of 9 treatments without repetition to proceed. The next step was to use the geometry of the combustion chamber that the software itself provides, build the areas of interest using the Design modeler software, perform the mesh considering meshes in more detail in areas of interest such as the spray and the ignition point using Meshing Autodine software. In the third step, the Navier Stokes equations were solved using the 𝑘 - 𝜀 (RNG) Re-Normalisation Group turbulence model in conjunction with the fuel injection chemistry and the fuel injection model. The last step consists of setting the simulation environment when selecting the ignition model for modeling the turbulence of the flame, defining the boundary conditions and the start of the combustion chamber. The procedure detailed in the previous paragraph was carried out for the 9 treatments proposed by the factorial design and once each of the simulations had been completed, the results obtained during the combustion process that occurred between the angles were analyzed and interpreted. piston displacement from 720 to 740 Crank Angle (CA).
