Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 8 de 8
  • Item type:Ítem,
    Optimización de la Geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 4+875 – 9+750 perteneciente a la Provincia Tungurahua
    (Ingeniería Civil y Mecánica. Carrera Ingeniería Civil, 2025)
    Naula Calo Katerin Mishel
    ;
    Aldás Sánchez Milton Rodrigo
    This technical project responds to the need to improve road infrastructure conditions and ensure efficient and safe mobility for users traveling between the abscissas 4+875 and 9+750, within the urban area of the city of Píllaro. The main objective is to optimize vehicle travel times, contributing to the strengthening of economic development and tourism in the affected areas and their areas of influence, through the application of design criteria that comply with current technical standards. The project development was structured into three fundamental technical phases. The first phase consisted of preliminary studies, which included field activities such as topographic surveys and vehicle counts, necessary for estimating the road's average daily annual traffic. In the second phase, soil studies were carried out, applying both destructive and non-destructive tests to characterize the physical and mechanical properties of the soil, as well as measure the structural deflections of the pavement. With the data obtained, the third phase consisted of the geometric redesign of the road, considering the new projected TPDA, the terrain conditions, and current regulatory requirements. The horizontal, vertical, and transversal design elements were determined, complemented by the preparation of a reference budget that includes the costs associated with construction, ensuring the technical and economic viability of the project. The topographic analysis showed that the road section runs over mountainous terrain with steep slopes, while the traffic study classified the road as Class I. Regarding the soil, laboratory tests identified a silty sandy material, with an average CBR of 19.14%, suitable for use as a structural subgrade. Finally, the deflection results indicated that the initial sections require road rehabilitation. Based on the results, the roadway was redesigned with a pavement structure of 4.5 cm of asphalt, 15 cm of base, and 20 cm of subbase. The new cross section was also 7.3 cm wide, along with gutters and curbs. The estimated reference budget for this project was $1,731,993.21
  • Item type:Ítem,
    Diseño geométrico y estructura de pavimento de la vía entre el sector Viejo Minero y Pondoa en el cantón Baños de Agua Santa, provincia de Tungurahua
    (Ingeniería Civil y Mecánica. Carrera Ingeniería Civil, 2025)
    Barriga Borja Christopher Alexis
    ;
    Moya Medina Dilon Germán
    The geometric and structural pavement design was developed for the road connecting the Viejo Minero sector with the Pondoa parish, which belongs to the Baños de Agua Santa canton in the Tungurahua province. This intervention covers a total length of 7.219 kilometers and addresses the need for rehabilitation. The importance of this road lies in its role as a vital artery for local residents, who rely on it for the transportation of agricultural and livestock products. Furthermore, its route plays a key role as an alternative connection to areas renowned for their scenic beauty and tourism value. During the diagnostic phase, a traffic study was conducted that identified an Average Annual Daily Traffic (AADT) of 31 vehicles, predominantly composed of light transport vehicles, machinery used in agricultural activities, and light-duty trucks. Based on this information and in accordance with the guidelines established by Ecuador’s Ministry of Transport and Public Works (MTOP), it was determined that the road corresponds to a Class IV classification, which refers to rural roads intended to support low traffic volumes. This classification served as the basis for defining the design parameters necessary to ensure functionality and operational safety. Regarding the geometric design, the project included both horizontal and vertical alignments, cross-sections adapted to the environment, as well as specific road safety criteria. All of these elements were tailored to the topographic and geotechnical characteristics of the study area, following a detailed topographic survey and soil analysis. The results revealed sections with low load-bearing capacity soils, which became a determining factor in the structural configuration of the pavement and the selection of appropriate construction materials. The pavement structure was designed using the 1993 AASHTO method, suitably adapted to the local conditions in terms of traffic, climate, and soil type. Based on these parameters, a flexible pavement solution was selected, designed to provide efficient performance
  • Item type:Ítem,
    Optimización de la geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 9+750 – 14+625 perteneciente a la provincia Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2025-02)
    Caisaluisa Aimacaña, Lady Jazmin
    ;
    Aldás Sánchez, Milton Rodrigo
    Social development and road safety are closely related to the quality and functionality of the road infrastructure, which must meet the appropriate technical requirements. This technical project focuses on addressing the challenges associated with the growth of vehicular flow on the Pillaro road, proposing a comprehensive solution based on the optimization of its geometric design. The main objective is to improve traffic conditions and reduce travel times for tourists using this route, thus contributing to the tourism and economic development of the region. In order to meet this objective, fundamental activities were carried out, such as a topographic survey using a high-precision GNSS system, an exhaustive analysis of vehicular traffic, and soil studies carried out in accordance with current regulations. These analyses were essential to determine the physical and mechanical characteristics of the terrain, crucial elements in the formulation of the design proposal. The optimization proposal includes both the geometric redesign of the road and the structural calculation of the pavement, incorporating these elements in an estimated budget and an execution schedule. A total road length of 4.875 km was established, along with a projected annual average daily traffic (ADAT) of 7805 vehicles/day for a design period of 20 years. This projection allowed the road to be classified as a Class 1 arterial road, in compliance with current regulations. As a result, the soil studies revealed a design CBR of 20.31 percent, qualifying the material as highly suitable for use as subgrade. Based on these results, the optimum thicknesses for the different layers of the road were determined: 7.5 cm for the asphalt layer, 15 cm for the base and 20 cm for the subbase, thus guaranteeing the durability and functionality of the road. In addition, a detailed economic analysis was carried out, estimating an execution budget of $1,467,274.83. This investment is intended to improve connectivity between the communities and the urban area, promoting economic development in the region.
  • Item type:Ítem,
    Diseño geométrico vial y del pavimento de la vía Salcedo - Alpamalag en los sectores San Andrés de Pilaló - San Pedro de Jachaguango desde la abscisa 0+000 hasta la abscisa 4+500 perteneciente al cantón Salcedo, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    López Uribe, Santiago Ismael
    ;
    Pérez Maldonado, Ruth Lorena
    The geometric design of the Salcedo – Alpamalag road was carried out due to various problems such as the difficulty of transportation for farmers in the sector, poor condition of the road and its lack of maintenance, resulting in low economic production in the adjacent sectors. The technical project began with a prior inspection of the place, in order to collect information and carry out the topographic survey with high precision equipment (RTK), subsequently a vehicle count was carried out for 7 days for 12 hours a day to obtain traffic levels and then its TPDA, then 6 soil samples were extracted at different points of the road, which were taken to the faculty laboratories for their respective tests of moisture content, granulometry, Atterberg limits, Proctor compaction and CBR, with the help From the CBR data of the soil, it was possible to design the structure of the pavement and the thicknesses corresponding to each of its layers, complying with the AASHTO 93 regulations and finally the reference budget was calculated based on the volumes of work, materials and equipment necessary to the correct execution of the project. With the analyzes carried out, a mountainous relief was determined, in addition to the fact that it is a Class IV road, the tests determined that the soil is a silty sand (A-2) and the design CBR for the pavement is 8%, having a The result was a 5 centimeter asphalt layer, a 15 centimeter granular base and a 20 centimeter subbase.
  • Item type:Ítem,
    Elaboración de un plan de mejoramiento de la vía que une los sectores de la libertad de la parroquia Huachi Grande con el barrio Condorloma de la parroquia Santa Rosa del cantón Ambato
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Gavilanes Rivera, Albert Alexander
    ;
    Moya Medina, Dilon Germán
    Adequate road infrastructure that complies with technical standards is essential to ensure the progress of society and traffic safety. In response to this situation and considering the needs of the GAD Parroquial de Huachi Grande and Santa Rosa, this project aims to propose a comprehensive improvement plan for the road linking these two parishes, since the current conditions do not guarantee the required safety and efficiency. For this purpose, a topographic survey was carried out with RTK equipment and a study of vehicular traffic. Subsequently, soil studies were carried out based on standards, thus establishing the physical and mechanical properties. This was followed by the improvement plan, which consisted of a geometric design of the road, as well as the calculation of the pavement structure, information necessary to prepare a referential budget and schedule. As a result, a road length of 4+640.89 km was defined, in addition to a future TPDA of 2687 vehicles/day for a design period of 20 years, classifying this road as class II. Subsequently, a design CBR of 13.35 percent is highlighted, which defined the soil as fair to good for use in subgrade. In addition, thicknesses of 7.5 cm were calculated for the asphalt binder, 15 cm for the base and 20 cm for the subbase. Finally, an economic analysis was carried out to obtain a budget for the implementation of the project of $1,514,594.25 and a time frame of 24 weeks.
  • Item type:Ítem,
    Diseño geométrico de la vía que une los sectores de unión Baserosario Yaku perteneciente a la parroquia Veracruz, cantón Pastaza, provincia de Pastaza
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Quispe Escobar, Richard Rai
    ;
    Núñez Aldas, Galo Wilfrido
    The choice to improve the road that connects the sectors of Unión Base-Rosario Yaku in the province of Pastaza is due to its poor condition, which harms the residents of the area. It is crucial to carry out a geometric design to optimize mobility and guarantee the safety of the inhabitants who transit daily. The current conditions of the road represent a significant risk, increasing the probability of accidents and negatively affecting the quality of life of users. To address the geometric design of the road, quantitative and qualitative methodologies were used, with field and bibliographic research methods. Quantitative methodologies made it possible to collect and analyze numerical data on traffic and the physical conditions of the road, while qualitative methodologies provided information on user needs. The road was designed using various software and complying with the regulations of the Ministry of Transportation and Public Works. In addition, tests were carried out on soil samples collected in the field, determining their moisture content, granulometry, Atterberg, Proctor and CBR limits. As a result, the project studies revealed that the area has a flat relief, classifying the road to be designed as class IV, while the soil tests identified an A-2-7 soil “gravel and clayey or silty sand” in all samples. extracted, with a design CBR of 9.30 percent indicating an asphalt layer thickness of 5 centimeters, a granular base of 15 centimeters and a subbase of 20 centimeters.
  • Item type:Ítem,
    Diseño geométrico y de pavimentos de la vía interparroquial Aláquez – San Marcos – Pilatan tramo 0+000 a 4+810 de la ciudad de Latacunga provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-07)
    Chulde Osorio, Bryan Alexander
    ;
    Pérez Maldonado, Ruth Lorena
    The Decentralized Autonomous Government of the Aláquez Parish of the Latacunga canton, in favor of territorial investment, has sought to improve the current conditions of its road network, with the purpose of enhancing the commercial attractiveness of small and medium-sized industries, as well as, the collective well-being of the sector, which will benefit from the positive impacts that an adequate road infrastructure attracts. For the project, multiple processes were carried out in order to obtain bases and resources that converge in the geometric and road pavement design, all of them based on the MTOP 003 and AASHTO regulations, starting with vehicle counting and traffic analysis. existing where the traffic variation was observed during a week, and future traffic was projected considering volumes of fuel consumption for a 20-year design period; This allowed the road to be classified as “Class III Collector”, subsequently the topographic survey of a total of 4.81 km was carried out, with slopes between 5 and 15 percent, in such a way that the relief was considered undulating. In addition, a total of 5 soil samples from 5 pits were tested to obtain their index and mechanical properties, which showed, as a general result, the presence of soil of excellent to good quality. Finally, after carrying out the design and considering the transversal drainage works, designed with rainfall information collected from precipitation and temperature bulletins from 2018 to 2021, the reference budget of the project was estimated, which is equal to $1,505,478.42.
  • Item type:Ítem,
    Diseño geométrico de la vía que une desde el sector Arajuno – hasta el sector Juan Vicente, cantón Arajuno, provincia Pastaza
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-08)
    Aviléz López, Johnny Misael
    ;
    Pérez Maldonado, Ruth Lorena
    This project focused on the geometric design of the road in the Arajuno canton - Pastaza Province, addressing the lack of connection between the roads in the Arajuno sector and the Juan Vicente sector in order to improve the socioeconomic situation of the population of the sector and its surroundings. The characteristics of the road were identified by means of a topographic survey with a total station, with specific points of the road to be designed. Continuing, the information of the vehicular flow was collected through a manual count of 7 days (Monday to Sunday) in a schedule from 7 am to 7 pm from December 13, 2022, with which the Annual Average Daily Traffic was calculated, resulting in a 20-year projection equal to 48 average vehicles per day. By means of the six samples divided in 2 sections the study determined as organic silt soil of low plasticity with an average humidity of 52.7 percent; in addition to a percentile limit of 10000 - 1000000 for medium traffic; and the CBR of 5.74 percent resulting in an adequate soil. Concluding that the traffic volume on the road is low, classified as an agricultural production road, with a reliability of 80 percent, as well as that the road will be class III for a mountainous terrain, with a design speed of 60 km/h, both horizontal, vertical and cross section along the project using 100 percent of W18.