Ingeniería en Sistemas, Electrónica e Industrial
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1
Examinar
2 resultados
Resultados de la búsqueda
Item type:Ítem, Planeación de la capacidad de producción en el área de lavado y tinturado de la empresa de jeans “Andrews”(2025-07) ;Chicaiza Chiluisa Kevin David ;Sánchez Rosero Carlos HumbertoUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería IndustrialThe research project was developed in the company “ANDREWS”, dedicated to jeans washing processing, which faces critical problems due to the absence of structured methodologies for capacity planning. Operations were managed based on empirical knowledge, generating delays in deliveries, disorganization in the allocation of resources and an overload of labor, mainly evidenced in the excessive overtime of the personnel. Translated with DeepL.com (free version) In response, a comprehensive capacity planning model was designed with a specific focus on the laundry area, taking as a reference the demand forecast for February 2025. The methodology included the identification of key products through demand analysis, the determination of standard times for each process operation, and the evaluation of installed capacity through man-machine diagrams. in addition, computer tools such as Excel and Minitab were used for data collection, analysis and calculation of operating indicators, together with the technical documentation necessary to establish the basis for standardizing procedures. Finally, a capacity planning model was developed to systematically and flexibly structure the management of production capacity. This model provides detailed and reliable information on the times required for each process operation, which facilitates a more precise scheduling of demand. At the same time, it optimizes the allocation of human and technical resources, ensuring an efficient use of the installed capacity and contributing to the operational balance according to the real needs of the production system.Item type:Ítem, Estudio de tiempos y movimientos para la optimización del proceso productivo de la empresa “SPLENDID SU LAVANDERÍA”(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2022-03) ;Núñez Núñez, Christian AndrésOrtiz Guerrero, Daysi MargaritaThe present research project proposes to carry out a times and motion study in the company Splendid su Lavandería for garment washing service in order to standardize and seek improvements in the process. The current situation of the company has been identified by collecting important information regarding all its processes and facilities through direct observation of each area and talks with the workers, in addition, a survey was applied to general manager because she knows all the processes. An ABC study of historical data of the company was applied, managing to identify that regular washing service (washing by weight) has greater profitability, in this service entire study reflected in the document is focused. To obtain the necessary data for the development of project, a time measurement was carried out by timing, at the same time that activities and movements carried out by each worker in their area are detailed; The information obtained is organized through tables, flowcharts, layout and bimanual diagrams. Among the improvements, it is proposed to increase service capacity of bottleneck, in addition to make changes in the current plant layout by applying the SLP method (Systematic Plant Layout Planning); and to visualize changes made, a simulation was developed in FlexSim. Finally, the procedure manuals of the process were elaborated, as well as instructions for the folding area and for the management of the software used for the invoicing and registration of garments, managing to help employees in execution of their activities, being these a guide to obtain planned results; of the proposals, a reduction of 16.94% in the total distance traveled and an improvement of 28.12% in its service capacity are calculated.
