Ingeniería en Sistemas, Electrónica e Industrial

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1

Examinar

Resultados de la búsqueda

Mostrando 1 - 2 de 2
  • Item type:Ítem,
    Sistema de planificación y control de la producción para la planta de montaje y terminado en el Centro de Innovación y Desarrollo Productivo de la Cámara Nacional de Calzado (CALTU)
    (Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2022-09)
    Morales Cunalata, Jonathan David
    ;
    Naranjo Chiriboga, Israel Ernesto
    The objective of this research is to design a production planning and control system for the assembly and finishing plant in the center of innovation and productive development of the Cámara Nacional de Calzado (CALTU), which joins the Italian-Ecuadorian cooperative project to provide the assembly and finishing process, as an external service, to the entire industrial sector that manufactures footwear, member or non-member of the entity, who needs to comply with this process of making footwear to fulfill their order orders on time. The investigation begins by studying the guide factories associated with CALTU to determine the times and manufacturing processes involved in the assembly and finishing of the footwear, in order to later know the production capacity that the company will have and to be able to determine the amount of necessary materials. to meet production requirements. Aggregate plans and master production plans are generated taking into account data such as forecast demands and capacities of the new factory to obtain as well the necessary workforce, production quantity and production capacities that meet the future requirements of potential customers the CALTU. To fulfill this purpose, a computer tool is designed using Excel software, in which its input data is given by customer orders and the output data are weekly and daily production orders generated according to process times. necessary materials and labor required to meet the demand.
  • Item type:Ítem,
    Análisis de riesgo y diseño de plan de contingencia para recuperación ante desastres en Florida Education Institute (FL-USA) según la norma ISO 24762-2008
    (Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería en Sistemas Computacionales e Informáticos, 2022-09)
    Montesdeoca López, Benjamíın Paúl
    ;
    Balarezo, Julio Enrique
    In the business world as in that of any organization or entity, which handle vital information of their clients face several problems related to the technological area, especially when it comes to storing, securing and recovering all the data after various scenarios such as an attack or misuse of computer equipment, obsolescence in servers and even natural catastrophes that can harm and damage the entire infrastructure established in the institution, which leads to the loss of information, which harms the business chain, making daily activities an ordeal for users. To deal with these problems, it is vitally important to have a contingency plan that allows you to be prepared for any eventuality that can cause great damage within any organization and to be aware of everything that can happen at the level of natural disasters or direct attacks on information of the companies. That is why the Florida Education Institute (FEI) has allowed the creation of a contingency plan for its information technology area, where the risks and shortcomings within this department were evaluated and the necessary corrective measures were taken to avoid any type of problem in the future. The ISO 24762-2008 standard was used, because it takes into account aspects such as the use of services from other companies that provide computer solutions to FEI, with which it was evaluated if everything works correctly and if there are the corresponding guarantees to operate with these external tools. At the end of the project, a contingency plan was obtained tailored to the requirements and observations obtained from FEI, with which the institution can be prepared for most risks that may exist and have the knowledge of what to do in the face of these problems and solve them in a timely manner fast and efficient way.