Ingeniería en Sistemas, Electrónica e Industrial
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/1
Examinar
5 resultados
Resultados de la búsqueda
Item type:Ítem, Estudio de tiempos y movimientos en la Cooperativa de Ahorro y Crédito Chibuleo Ltda.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial, 2024-02) ;Montachana Galarza, Christian IsraelLópez Arboleda, Jessica PaolaThe study of times and movements is carried out in the credit granting process at Cooperativa de Ahorro y Crédito Chibuleo Ltda., with the purpose of optimizing and improving the flexibility of activities and tasks. Through direct observation and a meeting with the agency manager, the current situation and the level of operations achieved in the last months are known. Based on the initial diagnosis, information was gathered and represented in flow charts, SIPOC and flowcharts, which were made possible through field visits to the institution. To obtain the necessary data, time measurements were taken by timing the activities, considering the movements and working conditions of the workers. In the development of the project, shortcomings and the bottleneck that strictly affect the process were identified, and then the standard times of the activities were determined. Through the use of the VSM diagram, the operational flow was examined with the purpose of selecting the Lean Manufacturing tools, thus improving the flexibility in the work flow and the tasks performed by the workers on a daily basis, obtaining an improvement percentage of 48.27% in the process, which is even reflected in the total cost, since it was reduced from $ 176.73 to $ 154.80, thus increasing the profitability of the financial institution.Item type:Ítem, Sistema de planificación de la producción mediante un plan Agregado de producción, para el mejoramiento de la Productividad(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Maestría en Producción y Operaciones Industriales, 2021) ;Córdova Córdova, Edison SaúlAcosta Velarde, Jaime IvánThrough research, a production planning system has been designed through an aggregate production plan to improve productivity. Before the design of the system an analysis of the current situation of production planning is carried out measuring its current productivity which is at 74.39 %, by means of a statistical analysis with the Pareto diagram it is determined that 82.44 % of the sales of greater rotation are the circular saw machines of 600 mm, 450 mm planer and 330 mm edger, of these three types of machines a forecast of future demand is made through a linear regression model from the historical sales of the periods 2017 to 2020, the estimated demand is used as input for the calculation of the three types of aggregate production plans that it is proposed to develop, the three ways with which it is proposed to carry out the production are: Plan 1: variable labor force and exact production, Plan 2: constant labor force and variable inventory and Plan 3: constant labor force and extra time, with the use of Excel software the calculations for these plans are made and it is obtained as a result that Plan 2: constant workforce and variable inventory is the most economical with 170.043.87 dollars with respect to Plan 1 with a cost of 17.0985,34 dollars and Plan 2 with a cost of 176.874.86 dollars, in conclusión Plan 2 is the one that best fits the conditions of the production design and resources of the company, then a production master plan is developed to meet the estimated future demand in this research, and finally productivity is measured after the design of the planning system obtaining an increase in productivity by 12.64%.Item type:Ítem, Análisis de la capacidad instalada en la línea de ensamble del modelo M4 de la Ensambladora CIAUTO Cia. Ltda..(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera Ingeniería Industrial en Procesos de Automatización, 2017-06) ;Manobanda Bosque, Andrés DavidTigre Ortega, Franklin GeovannyEl presente estudio abarca temas de investigación relacionados a la Capacidad de Producción Instalada, aplicando métodos concernientes a la medición del trabajo, enfocadas al análisis de tiempos y movimientos, con el fin de eliminar tiempos muertos, cuellos de botella, reducir componentes no conformes, mejorar condiciones de trabajo, logrando con ello generar un adecuado Balanceo de Líneas productivas que se acoplen al plan de producción en el ensamble del vehículo Modelo Great Wall M4 producido por la empresa CIAUTO. Inicialmente se realizó la identificación de los diferentes procesos de ensamble que se ejecutan en las diez estaciones de trabajo, para con ello efectuar la toma de tiempos mediante el empleo de cronómetro, logrando determinar el cuello de botella dentro del proceso de ensamble del Modelo M4, permitiendo de esta manera gestionar alternativas de solución para una producción de once unidades diarias. En la medición de tiempos se efectuó el cálculo de tiempo normal y estándar, con el fin de identificar en que áreas de trabajo se debe reasignar actividades, con el único objetivo de equilibrar la línea de ensamble obteniendo de esto una reducción de 10 minutos en el tiempo estándar, esto hace referencia a que por cada auto que anteriormente se ensamblaban se ahorran 10 minutos y de acuerdo al plan de producción que son de 11 unidades en una jornada laboral se optimizaría un total de 110 minutos, consiguiendo de esta manera una línea de ensamble equilibrada y ajustada al Takt Time determinado, con igual carga de trabajo, eficiente uso del talento humano y de los recursos con los que cuenta la empresa. En el análisis de la Capacidad Instalada (CI) se obtuvo un valor de 55, 2 vehículos/semanales, esto significa que la ensambladora en base a sus recursos, equipamiento e infraestructura está en la capacidad de ensamblar 55 Modelos M4 semanalmente que pasados a días se pueden producir 11,04 vehículos/diarios, este valor ratifica que además del cumplimiento del plan de producción fijado por el coordinador de ensamble se puede ensamblar cada lote de M4 correspondiente a 60 autos en una semana y un día aproximadamente, satisfaciendo de tal manera los pedidos de los clientes y la demanda del mercado nacional. SUMMARY The present study includes research topics related to the Installed Production Capacity, applying methods related to the measurement of work, focused on the analysis of times and movements, in order to eliminate downtimes, bottlenecks, reduce non-conforming components, improve working conditions, thus generating a proper balancing of lines productive that fit the production plan in the assembly of the vehicle model Great Wall M4 produced by the CIAUTO company. Initially was performed the identification of the different assembly processes that that were executed in the ten workstations, by through this make the time taking using a timer, managing to determine the bottleneck within the process of assembly of the M4 model, allowing in this way to manage alternative solutions for a production of eleven units daily. In the times measurement was performed calculated the normal and standard times, in order to better identify in which areas of work was should reassign activities, with the sole objective of balancing the assembly line, obtaining of this reduction 10 minutes in the standard time, this makes reference to that for each car that previously were assembled they are saved 10 minutes, and according to the production plan that are of 11 units in a working day would optimize a total of 110 minutes, getting this way a balanced assembly line and adjusted to the Takt Time determined, with equal workload, efficient use of human talent and resources with which the company has. In the analysis of installed capacity (CI) was obtained a value of 55, 2 vehicles / weekly, this means that the jointer based on their resources, equipment and infrastructure is in the ability to assemble 55 M4 models weekly that passed to days can to produce 11.04 vehicles / day, this value ratifies that in addition to the fulfillment of the production plan set by the assembly coordinator can be assembled each lot of M4 corresponding to 60 cars in a week and a day approximately, thus satisfying customer orders and the national market demand.Item type:Ítem, Estudio de capacidad de producción de la línea de caucho en la Planta de industrias diversas de la Empresa Plasticacucho S.A.(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2016-02) ;Sánchez Sailema, Mayra LorenaRosero Mantilla, César AníbalEl presente trabajo de investigación tiene como finalidad realizar un estudio de capacidades de la línea de caucho de la planta Industrias Diversas de la empresa PLASTICAUCHO INDUSTRIAL S.A mediante el uso de un complemento de Excel; SOLVER, para lo cual primero se realizó un análisis de la línea de caucho para conocer su forma de producción, sus entradas, salidas, actividades y recursos, para lo cual se efectuó un levantamiento de procesos. Se obtuvo los datos que se necesitan de los diferentes departamentos de la empresa, para poder realizar el análisis posterior, tales como tiempos, plan maestro de producción y costos del personal. Para el estudio se obtiene la lista de los productos más comercializados de la línea, tomando para el estudio las familias más representativas. Con el objetivo de analizar las capacidades se establece el plan agregado tomando dos alternativas: plan inventario cero y fuerza de trabajo nivelada, para lo cual se analiza los costos de mano de obra y costos de mantener inventario. No se toma en consideración los costos de contratación y despido ya que existe una modalidad de movilizaciones en la empresa, lo que para los planes agregados no genera costos. Con los estándares de producción se determina la utilización de la capacidad instalada de la línea de caucho y se propone nuevas medidas para disminuir costos de producción y poder utilizar de manera eficaz las instalaciones de la planta. También se propone nuevos volúmenes de producción en caso de requerir o tener más demanda, con los mismos recursos, incluyendo cuarto turno y trabajo continuo. ABSTRACT This research aims to conduct a study of the online capabilities of ICEM Rubber Company PLASTICAUCHO INDUSTRIAL SA plant by using an Excel; SOLVER, for which an analysis of the first line of rubber was carried out to know their way of production, its inputs, outputs, activities and resources for which a survey was conducted processes. The data needed from different departments of the company, to make the post, such as time, master production plan and staff costs analysis was obtained. To study the list of the most sold products in the line, taking to the study the most representative families were obtained. Zero inventory plan and level work force, for which the cost of labor and cost of holding inventory is analyzed: In order to analyze the added capabilities plan is established by taking two alternatives. It does not take into consideration the costs of hiring and firing as there is a mode of mobilization in the company, which plans to aggregate not generate costs. Production standards using the installed capacity of the line of rubber is determined and further efforts to reduce production costs and to make effective use of the facilities of the plant is proposed. New production volumes are also proposed in case you need or have more demand, with the same resources, including fourth turn and continued work.Item type:Ítem, Distribución de planta en las instalaciones de la Empresa Gamo's(Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatización, 2014-11) ;López Córdova, María FernandaReyes Vásquez, John PaúlRESUMEN El proyecto de investigación se centra en elaborar una Distribución de Planta ya que la empresa Calzado Gamos al ser una de las más grandes del centro del país cuenta con un elevado índice de producción y el mal diseño de sus instalaciones provoca que se generen estancamientos en el flujo de material a través de sus procesos de producción. En el análisis de estudio de tiempos y métodos se identifica que se realizan muchos transportes, lo que disminuye la capacidad de producción, además la empresa no cumple con la normativa legal en cuanto a espacio físico. En total el área de producción requiere de 977,92m2, valor que se calcula mediante el método Guerchet. La inversión para la construcción de la nueva planta es de $169.500 con un período de retorno de 1 año 5 meses. El análisis de la nueva distribución se apoya en el software Flow Planner con lo que se logra disminuir las distancias recorridas y se genera un aumento en la capacidad instalada de 82 pares de zapatos con una utilidad anual de $118.080. ABSTRACT The research project focuses on developing a distribution plant as the company Gamo´s beings one of the largest in the center of the country has a high rate of production and the poor design of their facilities causes deadlocks generated in the material flow through production processes. In the analysis of time study and identifies methods that are performed many transport which decreases the production capacity, the company also does not comply with the legal regulations regarding physical space. A total area of 977.92 m2 production required, value is calculated by the method Guerchet. The investment for the construction of the new plant is $ 169.500 with a return period of 1 year 5 months. Analysis of the new distribution is based on the Flow Planner software which is achieved with the distances decrease and an increase in the installed capacity 82 pairs of shoes with anual utility of $ 118.080 is generated.
