Ingeniería Civil y Mecánica
URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898
Examinar
26 resultados
Resultados de la búsqueda
Item type:Ítem, Diagnóstico visual y estructural del pavimento de la vía comprendida desde el barrio Cruzpamba – hasta la cancha del barrio Santa Rita, longitud de intervención 4+200 km, perteneciente a la parroquia Píllaro, del cantón Santiago de Píllaro(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08) ;Viteri Izurieta, Daniel AlexanderFrías Torres, Alex XavierThe visual and structural evaluation of the road from the Cruzpamba neighborhood to the Santa Rita neighborhood court was very timely, since a road in good condition is assimilated with better living conditions for the residents. Several technical and regulatory assessment procedures were carried out, starting with a vehicle registry for the development of the TPDA currently with a 20-year projection, consecutively an estimate of the pavement condition index was made specifically in 14 units throughout the year. track section, and 9 Benkelman beam tests, the following tests were applied with the soil samples obtained: moisture content, granulometry, Atterberg limits, modified Proctor type “B” and CBR. For the first section from the abscissa 0+000 to the abscissa 2+000, a technical solution was established with a periodic level intervention since the state of the pavement in said section does not present a severe level of aggressiveness, contrary to the abscissa 2+000 to 4+200 an intervention was carried out at the road rehabilitation level, these decisions were made based on the visual and structural evaluation. As a result, in the case of periodic maintenance, the budget necessary to carry out all the interventions considered through various items is $62899.67 USD, and finally for road rehabilitation, a series of necessary items with an estimated value of $221138.72 USD were considered.Item type:Ítem, Evaluación visual y estructural del pavimento de la vía que va desde la intersección con la Troncal de la Sierra (e35) a la comunidad Galte Chine Pungo, en el tramo km 0+000 hasta km 4+000, de la parroquia Palmira, cantón Guamote, provincia de Chimborazo(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08) ;Rueda Barahona, Francis JoelNuñez Aldaz, Galo WilfridoThe surface and structural evaluation of the pavement of the road that runs from the intersection with the highland trunk road (e35) to the Galte Chine Pungo community was carried out due to the different physical (potholes, cracks) and visual (lack of lights and ethical signs) problems that affect the safety and comfort of users. The experimental work began with the extraction of samples through the elaboration of calicatas one per km. This was followed by the collection of field information such as vehicle counts to determine vehicular demand, the characteristics of the subgrade material based on granulometry tests, Atterberg, Proctor and CBR limits, then the surface condition of the road was determined by visual inspection of the PCI and the structural condition of the road by determining the deflections using the Benkelman beam. As a result, once the field data and laboratory tests were processed and analyzed, it was determined that the most appropriate intervention for the track under analysis is periodic maintenance, since type I deflections and an average PCI of 54.07 were determined. Finally, a reference budget was prepared to carry out the proposed maintenance plan with a final value of $87.813,97 as of the date of publication.Item type:Ítem, Evaluación del proceso de conservación de la estructura del pavimento asfaltico de 4,2 km de la vía Cunchibamba - San Andrés(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08) ;Aguilar Salazar, David SalomónAldás Sánchez, Milton RodrigoAn analysis of the current situation of the Vía Cunchibamba – San Andrés was carried out due to its intense commercial and tourist activity, which has caused a notable deterioration in its surface. Given this circumstance, it will be deemed necessary to examine the deficiencies and condition of the road, identifying the most worn areas and critical problems, in order to propose a maintenance plan that guarantees safe and comfortable circulation. A research process was initiated to carry out a georeferenced topographic survey, collecting 550 points. Then, a vehicle count was carried out for 12 continuous hours over 7 consecutive days, determining the projected TPDA and TPDAf for 20 years, considering the road as a Class II Collector. Next, the soil was studied using granulometry tests and Atterberg limits, making pits of one cubic meter for each kilometer and in the initial Abscissa, the California Support test, obtaining an average of 20.43 percent, classifying it as a subgrade quality from Fair to Good and Excellent. In addition, a deflection analysis was carried out in the rolling layer using the Benkelman Beam, showing type I deflections. Finally, the Pavement Condition Index method was used, identifying existing faults on the road to carry out the respective maintenance plan and a reference budget for conservation so that the road can be in an optimal state for its use.Item type:Ítem, Elaboración de un plan de mantenimiento y conservación vial desde la intersección de la vía e491 con la calle Guayaquil abscisa km 0+000 hasta el sector san pablo abscisa km 4+000, de la parroquia rural santa rosa del cantón Ambato, provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08) ;Romero Cedeño, Genesis NayeliMuyulema Muyulema, Danny GermanThe road that connects the intersection of E491 with Guayaquil Street to the San Pablo sector, in the Santa Rosa parish, Ambato, presents significant deterioration that affects road safety and the fluidity of traffic. To address this problem, a comprehensive road maintenance and conservation plan has been developed that considers a vehicular traffic study, a surface and structural evaluation of the pavement, the design of an appropriate pavement structure and the estimation of a reference budget. The vehicular traffic study determined a current TPDA of 3196 veh/day, with a projection of 5883 veh/day for the year 2044. The pavement evaluation revealed an average PCI of 48, indicating a fair condition. Based on these results, three types of necessary interventions were identified: milling in the first section, complete reconstruction in the second section and land clearing with removal of the vegetation layer in the third section. A pavement structure was designed with a thickness of 5 cm for the asphalt layer, 15 cm of granular base and 20 cm of granular subbase, complying with AASHTO 93 regulations and considering the projected traffic. The total budget for the implementation of the maintenance plan is $496,751.15. As a result, the implementation of the road maintenance and conservation plan will improve road conditions, increase user safety, and optimize road maintenance management by the Santa Rosa parish GAD.Item type:Ítem, Desarrollo de un plan de mantenimiento preventivo, para los equipos y máquinas del Tecnicentro Pacavih(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2024-08) ;Haro Solís, Andrés AbelLópez Velástegui, Jorge EnriqueIt is crucial to highlight that industrial maintenance is a fundamental element in the productive process of any industry or company, as it focuses on the reduction and optimization of business development. This allows for the reduction of failures in machines, equipment, and installations, thus preventing economic losses for the organization. In the present research, both quantitative and qualitative methods were employed, applying numerical, mathematical analyses, and result reviews; AMFE and Criticality matrices were also conducted, considering them of great importance, to provide maintenance criteria based on engineering. The research is based on data from primary sources collected in the field through surveys, inspections, and interviews. Additionally, a computer-assisted maintenance model was used, which allowed for effective and assertive handling of the information, facilitating the main objective of the research. The current state of the equipment and machines was also determined to understand their level of functionality and operating conditions. As a result, regular and documented inspections must be carried out by trained personnel who use the appropriate tools and are familiar with the specific maintenance plan for each type of equipment or machine. It is important to foster collaboration between technicians and operators to ensure that evaluations are accurate and comprehensive. The information collected should be used to continuously update the maintenance plan and make informed decisions about repairs and replacements within the company.Item type:Ítem, Desarrollo de un plan de mantenimiento preventivo, para la maquinaria del área de trituración de materiales pétreos en la empresa Jeal Construcciones(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2024-02) ;Freire Revelo, Andrea PaolaLópez Velástegui, Jorge EnriqueThe company does not currently have a preventive maintenance plan, so it uses a reactive approach, in which it waits for equipment to fail before proceeding to repair it. This not only generates interruptions in the company's production, but also increases the risk of occupational accidents, reduces the useful life of the equipment and generates periods of inoperability, since the machinery used in the process of crushing stone materials is important for the company's operation. This project was developed in several steps, the first one was to make an inventory of the machines belonging to the crushing area, then the critical equipment was identified and its current status was evaluated, also technical data sheets, FMEA and statistical matrices were made where the availability of the machines could be analyzed and the criticality and identification of components susceptible to failures were determined. Different ranges of maintenance were elaborated with activity guidelines with the objective of improving the performance and useful life of the machines and their components, knowing their reliability and availability; subsequently, preventive maintenance matrices were elaborated with different activities and the periodicity with which they were carried out throughout the year. Finally, fulfilling the objectives, the maintenance plan was uploaded to a specialized software, with the objective of automating maintenance tasks and improving the efficiency and productivity of its processes and personnel.Item type:Ítem, Implementación de un plan de conservación y mantenimiento de la vía Artezón Valle Hermoso, desde la abscisa 0+000 hasta la abscisa 4+100, ubicado en el sector Artezón, cantón Pelileo de la provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-02) ;Pérez Jinez, Kathalina AracellyMoreira Cedeño, Fricson LutgardoThe implementation of a conservation and maintenance plan for the Artezón Valle Hermoso stretch of road was carried out because it presented several physical (potholes, cracks) and structural (pavement) problems, and also affected the mobility of the inhabitants of the sector, which is a productive sector. In order to carry out this technical project, soil samples were taken every 1000 m along the road under study and different properties of the road were determined, such as: granulometry, liquid limit, plastic limit, plastic index, soil bearing capacity, etc. In addition, a visual inspection was carried out using the pavement condition index, the result of which determined that the physical condition of the road was in a bad range, in addition to this, the deflections of the road were analyzed using the Benkelman beam, with these the behavior of the wearing course was obtained, which was also bad. Having made these calculations, and based on laboratory tests, it was concluded that the most appropriate maintenance for the road was a reconstruction, and we proceeded with the design of the pavement structure in which we obtained an asphalt layer of 5 cm, a class III base of 15 cm and a class III subbase of 15 cm. Finally, a referential budget was made to carry out the proposed reconstruction according to the maintenance plan, which was $411,936.34.Item type:Ítem, Desarrollo de un plan de mantenimiento preventivo basado en la gestión de activos, empleando la norma ISO 55000 para el taller industrial Jackson en la ciudad de Esmeraldas(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2023-09) ;Escobar Vallecilla, Erick EnriqueGuamanquispe Toasa, Jorge PatricioThis technical project was carried out with the purpose of implementing a preventive maintenance plan for the "Jackson" industrial workshop, based on asset management, as they do not currently have one, and also to guarantee support for the workshop's assets, which is why ISO 55000 was used. In the development, the coding of the machines was carried out in order to identify them quickly and easily; technical data sheets and a study of the current maintenance situation were made, this data was represented in the statistics and analysis of the curve of the machines' bathtub, which indicates the stage the machines are in. Then, a modal analysis of failures and effects (FMEA) was carried out with the parameters established in the technical note NTP 679, where the most critical components to suffer breakdowns and that can cause an unexpected stoppage of the machines were detailed, in order to know the functional failure, the causes of failures and effects; a criticality analysis of the equipment was carried out, in order to determine the most critical components of each machine. Finally, the preventive maintenance plan was developed, using a free technological software "Microsoft Excel", where the maintenance logs of each machine were detailed, the generation of the monthly report and data; it is possible to save and print each of the generated reports, in order to manage in a faster and simpler way.Item type:Ítem, Mantenimiento correctivo y preventivo para la cámara de acondicionamiento del Laboratorio de Investigación de Mecánica Lim-Uta de la Universidad Técnica de Ambato(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2023-09) ;Estacio Betancourt, Marcel HumbertoCastro Miniguano, Christian ByronThe present study focuses on the utmost importance of maintaining the conditioning chamber in optimal conditions, as it is fundamentally used to properly condition the samples used in the flammability test, ensuring with certainty and precision that they possess exactly the same properties distributed homogeneously throughout the extent of their surface. If, unfortunately, the chamber presents any unexpected breakdown or unforeseen defect, the process to carry out the test will be severely affected, causing untimely and costly equipment shutdowns and significant financial losses for the laboratory. Corrective maintenance consisted of analyzing the damaged parts or systems and providing them with the necessary repair. On the other hand, preventive maintenance will involve collecting information about the equipment and developing a plan to avoid possible failures and address them. These maintenance plans are essential to keep the machine in operation and extend its useful life since they allow for the development of technical specifications, dossiers, and having spare parts for components and maintenance procedures. As a result, it was possible to develop the dossier that detailed the generalities, operation, and maintenance of the conditioning chamber; examine the failure modes of the chamber components through a Failure Modes and Effects Analysis (FMEA) matrix and a criticality matrix; furthermore, thanks to this last one, the criticality levels of the equipment components were determined; perform corrective maintenance by identifying and replacing the damaged elements; and create a preventive maintenance plan that includes daily, monthly, and yearly technical activities to prevent possible failures and breakdowns.Item type:Ítem, Diseño de un plan de conservación de la estructura de la capa de rodadura de la vía Pelileo - Cotaló abs 12+000 – 16+000 de la provincia de Tungurahua(Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-09) ;Fiallos Cevallos, María JoséPérez Maldonado, Ruth LorenaRiobamba city has various alternative routes for access, one of which is the Pelileo - Cotaló road. This road has shown deterioration in its pavement structure, raising the need for developing an appropriate conservation plan to maintain it in optimal conditions and ensure its functionality. An exhaustive topographic survey of the Pelileo - Cotaló road was carried out, providing detailed information about its physical characteristics. Additionally, vulnerable areas of the road were identified through this survey, laying a solid foundation for the subsequent development of the conservation plan. Furthermore, a comprehensive traffic study was conducted on the road, based on the Average Annual Daily Traffic (AADT). This analysis allowed for understanding the vehicular flow and vehicle characteristics, and the PCI was performed. These data were fundamental in comprehending pavement wear and deterioration, as well as identifying specific maintenance needs. As a result of this work, a specific maintenance plan was proposed to address the road's deterioration. The plan relied on the data obtained from the topographic survey and traffic study. Proposed actions included crack sealing, pothole repair, and periodic maintenance. These interventions have proven effective in improving the road's condition to ensure its durability and safety.
