Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 9 de 9
  • Item type:Ítem,
    Optimización de la geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 9+750 – 14+625 perteneciente a la provincia Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2025-02)
    Caisaluisa Aimacaña, Lady Jazmin
    ;
    Aldás Sánchez, Milton Rodrigo
    Social development and road safety are closely related to the quality and functionality of the road infrastructure, which must meet the appropriate technical requirements. This technical project focuses on addressing the challenges associated with the growth of vehicular flow on the Pillaro road, proposing a comprehensive solution based on the optimization of its geometric design. The main objective is to improve traffic conditions and reduce travel times for tourists using this route, thus contributing to the tourism and economic development of the region. In order to meet this objective, fundamental activities were carried out, such as a topographic survey using a high-precision GNSS system, an exhaustive analysis of vehicular traffic, and soil studies carried out in accordance with current regulations. These analyses were essential to determine the physical and mechanical characteristics of the terrain, crucial elements in the formulation of the design proposal. The optimization proposal includes both the geometric redesign of the road and the structural calculation of the pavement, incorporating these elements in an estimated budget and an execution schedule. A total road length of 4.875 km was established, along with a projected annual average daily traffic (ADAT) of 7805 vehicles/day for a design period of 20 years. This projection allowed the road to be classified as a Class 1 arterial road, in compliance with current regulations. As a result, the soil studies revealed a design CBR of 20.31 percent, qualifying the material as highly suitable for use as subgrade. Based on these results, the optimum thicknesses for the different layers of the road were determined: 7.5 cm for the asphalt layer, 15 cm for the base and 20 cm for the subbase, thus guaranteeing the durability and functionality of the road. In addition, a detailed economic analysis was carried out, estimating an execution budget of $1,467,274.83. This investment is intended to improve connectivity between the communities and the urban area, promoting economic development in the region.
  • Item type:Ítem,
    Rediseño geométrico y diseño estructural de pavimento de la vía Belen Cuatro Esquinas – Bellavista de Cusubamba desde la abscisa 0+000 – 5+000, ubicada en la parroquia Cusubamba, cantón Salcedo, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Jiménez Mogro, Alex Javier
    ;
    Bayas Altamirano, Myriam Marisol
    In recent years, Ecuador has tried to improve its competitiveness compared to other countries in its road infrastructure, however, not all areas of the country have managed to optimize their road network. Without going any further, the quality of the Cotopaxi Road network has been overshadowed by its neighboring provinces, which is why the need arises to address new projects that contribute to the evolution of the infrastructure. To contribute to this objective, road studies were carried out following the processes dictated by the MTOP 2003 regulations. Starting with the survey of the topographic strip using an RTK device that revealed that the road was in mountainous terrain. The traffic study indicated that the TPDA for a design period of 20 years would be 778 vehicles/day, classifying the road as a CLASS III collector. With this information, the geometric redesign was carried out, adjusting the existing road to a new layout that complies with the parameters suggested by the standard and also without exceeding very large cut and fill areas. The structural package was designed based on the AASHTO-93 Method using the design CBR obtained in the soil study, finally the minimum and recommended thicknesses for subbase, base and asphalt layer are configured. Finally, the road design proposal was evaluated, and an estimated budget was developed, providing a clear view of the resources required and facilitating accurate planning for future project implementation.
  • Item type:Ítem,
    Estudio para el mejoramiento del trazado vial y estructura de pavimento de la vía Mocha-Pinguilí
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Toscano Aguilar, Hernan Steven
    ;
    Núñez Aldás, Galo Wilfrido
    The present technical project of a road nature originates in response to the vehicular growth experienced by the Mocha-Pinguilí road, which has a direct impact on the geometric layout of the road. Currently, vehicles have difficulties when taking curves that do not have an adequate radius for efficient mobility. Likewise, as this is a commercial route, heavy truck traffic is common, so the current roadway width and pavement structure do not satisfy the growth of vehicles. This project began with a topographic survey using RTK equipment, followed by a traffic study using the 30th hour method. The soil study involved taking samples of the subgrade every 500 meters to analyze its characteristics and properties in the laboratory by means of moisture content, granulometry, Atterberg limits, modified Proctor type B and CBR tests. The geometric layout was made using the Ecuadorian standard MOP-2003, and some suggestions were taken from the standards: Peruvian DG-2018 and AASHTO-2018. The pavement design was developed according to the AASHTO-93 methodology and finally the project's referential budget was made. As a result, an undulating-mountainous relief was determined; the traffic study established a TPDAf of 2,762 vehicles/day and a number of equivalent axles of 1,716,466. A design CBR of 17.72% was determined. The geometric design established a 4-lane roadway and a reference budget of 2'153,849.70
  • Item type:Ítem,
    Diseño geométrico vial y del pavimento de la vía Salcedo - Alpamalag en los sectores San Andrés de Pilaló - San Pedro de Jachaguango desde la abscisa 0+000 hasta la abscisa 4+500 perteneciente al cantón Salcedo, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    López Uribe, Santiago Ismael
    ;
    Pérez Maldonado, Ruth Lorena
    The geometric design of the Salcedo – Alpamalag road was carried out due to various problems such as the difficulty of transportation for farmers in the sector, poor condition of the road and its lack of maintenance, resulting in low economic production in the adjacent sectors. The technical project began with a prior inspection of the place, in order to collect information and carry out the topographic survey with high precision equipment (RTK), subsequently a vehicle count was carried out for 7 days for 12 hours a day to obtain traffic levels and then its TPDA, then 6 soil samples were extracted at different points of the road, which were taken to the faculty laboratories for their respective tests of moisture content, granulometry, Atterberg limits, Proctor compaction and CBR, with the help From the CBR data of the soil, it was possible to design the structure of the pavement and the thicknesses corresponding to each of its layers, complying with the AASHTO 93 regulations and finally the reference budget was calculated based on the volumes of work, materials and equipment necessary to the correct execution of the project. With the analyzes carried out, a mountainous relief was determined, in addition to the fact that it is a Class IV road, the tests determined that the soil is a silty sand (A-2) and the design CBR for the pavement is 8%, having a The result was a 5 centimeter asphalt layer, a 15 centimeter granular base and a 20 centimeter subbase.
  • Item type:Ítem,
    Evaluación superficial y de la estructura del pavimento de la vía Pelileo – Guayaquil abscisa 4+580 – 9+160, ubicada entre los cantones Quero y Pelileo de la provincia de Tungurahua.
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-02)
    Vaca Tobón, Esteban Nicholas
    ;
    Moreira Cedeño, Fricson Lutgardo
    The Pelileo – Guayaquil road holds significant importance as it is situated between two cantons, Quero and Pelileo, and plays a crucial role as a transportation artery. Currently, it exhibits deficiencies that adversely affect the quality of life for the residents in the area. By enhancing connectivity between these two urban centers, the road becomes a key axis for the efficient distribution of goods, directly contributing to trade and the economic dynamics of the region. A methodology combining both quantitative and qualitative approaches was employed, guided by ASTM, AASHTO, and MTOP standards, providing a more reliable focus and assurance of effectiveness to the study. Data on both surface and structural deficiencies were collected through laboratory and field studies, using methods such as TPDA, which revealed that the road exhibits characteristics of a Type I highway. The PCI indicated a poor condition, and granulometry and Atterberg limits identified it as composed of fine sand (A3) and Class 4 Base. Modified Proctor and CBR tests indicated that the bearing capacity of these materials falls within a good range of 19-26 and 80-85 percent, respectively. These data were essential for formulating a maintenance plan to address these deficiencies. The results underscored the need for road maintenance, ranging from routine upkeep to reconstruction. Laboratory studies aided in determining the road's composition, a factor considered to reduce construction costs.
  • Item type:Ítem,
    Propuesta para la rehabilitación de la red vial de Tungurahua, grupo 1 de la vía Manzana de Oro-Cevallos de la provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-08)
    Silva Acosta, María Fernanda
    ;
    Chérrez Gavilanes, Diego Sebastián
    The Manzana de Oro road presents a very advanced deterioration, since being poorly designed it generates inconveniences in the mobilization between cantons, which influences Ambato and Cevallos, however, this does not apply only for maintenance since its failures are of great magnitude and are prone to generate accidents, so it is necessary a redesign and improvement of this infrastructure that is beneficial not only for the economy of these sectors but to provide security to the people. To conduct the new design of this road, a topographic study was carried out to identify the conditions in which it is located, based on points that were placed at an established distance. During consecutive hours near the starting point, it was possible to calculate the TPDA planned for 20 years and to conclude that the road belongs to Class R-I according to M.T.O.P. In addition to this, the physical and mechanical properties of the extracted soil were analyzed through soil tests guided under the AASHTO standard, such as moisture content, granulometry, Atterberg limits, modified Proctor and the CBR study which in turn generated results in a range between 11 to 20 percent qualifying the sample as a regular-good soil for pavement design. Finally, a new geometric design of the road was proposed based on the results that allowed unit price analysis and estimation of a reference budget.
  • Item type:Ítem,
    Diseño geométrico de la vía que une el sector Pindo Mirador y La Colonia 24 de Mayo perteneciente a la parroquia Mera del cantón Mera, provincia de Pastaza
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-03)
    Castro Vaca, Adrián Ruben
    ;
    Aldás Sánchez, Milton Rodrigo
    Given the lack of a road connection that helps improve the economic and social situation of the population of the Mera canton and its surroundings, the geometric design of a road that connects the communities of the Pindo Mirador Sector was developed in the province of Pastaza, Mera canton. and Colonia 24 de Mayo, in order to improve the transportation and marketing of products. To identify the characteristics of the terrain, a topographic survey was carried out with a total station, which provided specific points along the path of the road to be designed. Subsequently, the vehicle flow was studied by manual counting for 7 days from Monday to Sunday, 12 hours a day, which allowed the calculation of the Average Daily Annual Traffic (TPDA) and obtaining a value with a 20-year projection equal to 192 vehicles per day. The study of the soil was done by means of excavations of test pits with sections of 500 meters and the determination of the Relative Value of the Soil Support Capacity (CBR) of design equal to 3.8%, but for the calculation of the thicknesses of the soil layers. flexible pavement applying the AASHTO-93 Estándar I was used 15% because it is the value of better subgrade. Finally, the geometric design of the road was developed applying the standard of the Ministry of Transport and Public Works (MTOP), which establishes that it is a Class IV road for the horizontal, vertical and transversal design, as well as for the radii, slopes, ditches, cut and fill volumes, which were made with the Autodesk software. The referential budget was obtained with the calculation of work volumes and analysis of unit prices referenced in the busy guide system called Punis of the Provincial Decentralized Autonomous Government of Pastaza (GADPPz), allowing to know that the total value of the work is two million one hundred fifty one thousand eight hundred fifty with 22/100 cents.
  • Item type:Ítem,
    Mejoramiento del trazado geométrico y diseño estructural de pavimento de la vía Cruzpamba ubicada en la parroquia García Moreno, cantón Pelileo, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-03)
    Solís Carrasco, Verónca Alexandra
    ;
    Chérrez Gavilanes, Diego Sebastián
    The Cruzpamba road has serious problems throughout its road design, because it is in precarious conditions, this road connects two rural parishes, Garcia Moreno and El Rosario; with the improvement of this road we seek to benefit the economy of this sector. In order to improve this road, a topographic study was carried out and a 100-meter strip was selected to identify the current conditions of the terrain. The T.P.D.A. was carried out to determine the type of road; a manual count was made during 7 days for 12 hours to obtain the projected T.P.D.A., thus deducing that the road is a class III road according to the M.T.O.P.. Another important aspect is to know the physical and mechanical properties of the soil, several tests were performed such as moisture content, granulometry, Atterberg limits, modified Proctor type B and CBR, concluding that the type of soil in the area is a well graded sand with low plasticity silts according to the AASHTO classification; the CBR is between 11 to 20 percent and it is considered a regular - good quality soil and can be used as subgrade, therefore it does not need improvement, when the soil study was completed, the pavement was designed. Finally, two proposals were made for the geometric design due to the complexity of the terrain in order to select the best option and thus determine the unit price analysis, calculate work volumes and estimate the reference budget.
  • Item type:Ítem,
    Diseño del pavimento asfáltico de la vía alrededor del estadio central de Huachi Grande
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Vinculación de la Carrera de Ingeniería Civil., 2012-03)
    Paredes, Víctor Hugo
    ;
    Rosero, Ricardo
    El proyecto se realizó en la vía alrededor del estadio central de Huachi Grande, cantón Ambato, provincia de Tungurahua, el mismo involucra el estudio y diseño de la calzada de la vía para que puedan mejorar los moradores, su calidad de vida. Los datos obtenidos para el diseño de dicha vía fueron obtenidos en la localidad, realizando en primer lugar mediciones y posteriormente procediendo a buscar la calzada ideal para la vía en estudio. De ésta manera se procedieron a realizar cálculos, dibujo planimétrico y finalmente el presupuesto.