Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 1 de 1
  • Item type:Ítem,
    Diseño hidráulico de redes principales y parcelarias del sistema de riego por aspersión para mejorar la calidad agricola del sector Chaupiloma II, cantòn Pillaro
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-09)
    Verdesoto Tenorio, Breslyn Manena
    ;
    Paredes Beltrán, Bolívar Eduardo
    This technical project began with a socialization about the technified irrigation system since in the community there is the type of gravity irrigation, therefore the project will benefit the community, it was carried out in the general assembly of the community of Chaupiloma II Continuing with the process in the second meeting an agreement was reached with the owners according to the technical specifications and they decide to accept the semi-fixed irrigation system. Once the approval of the inhabitants was obtained, data collection began (topographic survey, data from the meteorological station of the Pisayambo station, etc.), with the aim of starting with the proposed designs (parcel design and main network). The parcel design process was continued using the IRRICAD V15 Software, simultaneously with this process the designs of the main network were made with the help of the AutoCad Civil 3D Software. With the plot designs, the diameters of the pipes that would be used, the number of sprinklers and the shift for each plot were determined, on the other hand, it was possible to determine with the design of the main network the diameter of the main pipe taken from the tank. existing reservoir in the area, the design of the sand removal system and the different accessories. The project was designed with an initial flow of 25.78lt/s, knowing that the sector is divided into three branches, the same as the data would be the following: Branch 1 (7.65lt/s), Branch (9.46 lt/s) and Branch 3 (8.67lt/s).