    Mejoramiento del trazado geométrico y diseño de la estructura de pavimento de la vía paso lateral Puyo Norte, cantón Pastaza, provincia de Pastaza
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2021-02)
    Salinas Terán, Danny Paul
    ;
    Bayas Altamirano, Myriam Marisol
    For the development of this technical project, a topographic survey was carried out, where it was possible to obtain 471 topographic points and determine a flat type topography, in the same way, a class IV road could be obtained by counting vehicular traffic, according to the regulations of the Ministry of Transport and Public Works. The study of soils was carried out, determining their physical properties (granulometry, SUCS classification, Atterberg limits, humidity percentage, maximum dry density, optimum humidity), and mechanical (design CBR), which was used for the calculation of the Flexible pavement structure supported by AASHTO Standard 93. In addition, the geometric layout of the road was improved based on the 2003 Standard for Geometric Design of Roads, meeting the requirements for horizontal and vertical design, later the transversal design of the road was also carried out. Finally, the project's referential budget was carried out together with its analysis of unit prices, revealing an estimated amount for the construction of the roa.
  • Item type:Ítem,
    Diseño geométrico de la alternativa vial Shuyo – Pinllopata en el tramo km 24+000 – 28+000 perteneciente a los cantones Pujilí y Pangua de la provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2020-08)
    Silva Coque, Esteban Fernando
    ;
    Moreira Cedeño, Fricson Lutgardo
    This project was carried out through preliminary studies since there is no design study on this road, topographic tools and equipment such as the RTK (Real Time Kinematic) equipment were used to obtain the contours of the existing road every 500 meters. In addition, a drone was used that flies over said route for imaging (orthophoto), video and obtaining the topographic strip. A fundamental part of this study was the field survey, which consists of a length of 4000 meters, is currently a ballast road. Subsequently, the topographic survey of the road and the design were carried out horizontally, vertically and transversely according to the regulations dictated by the Ministry of Transportation and Public Works of Ecuador. Then the Annual Average Daily Traffic (TPDA) was determined to know the level of service of the road which is Class IV in the estimated design period of 20 years, the calculation of cut volume of 213680.64 m3 was also achieved Due to the topography of the project and above all meet the requirements for this type of project. Finally, a referential budget was prepared for the construction of this road with optimum performance. Everything is described in this document both in tables, figures and plans duly detailed.