Análisis cuantitativo de un nuevo método de suministro para reducir tiempos muertos y mejorar productividad en líneas de ensamble automotor
| dc.contributor.advisor | López Velástegui Jorge Enrique | |
| dc.contributor.author | Moreano Pilatasig Dany Stiven | |
| dc.contributor.editor | Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Mecánica | |
| dc.date.accessioned | 2026-07-05T09:26:42Z | |
| dc.date.issued | 2026-07-05 | |
| dc.description | La optimización del suministro de materiales en las líneas de montaje de automóviles es uno de los mayores retos del sector manufacturero actual especialmente en la industria automovilística ecuatoriana en constante reestructuración donde la eficiencia en la producción y la reducción de residuos determinan la competitividad industrial. Este estudio empleó un diseño cuasiexperimental con metodología cuantitativa descriptiva y explicativa. Se analizaron las 9 estaciones de la línea de chasis del GWM POER CD 4X2/4X4 en una planta ecuatoriana durante marzo y abril de 2026 mediante cronometraje, diagramas de flujo y observación directa, con un nivel de confianza del 94,45 %. La variable dependiente fue el tiempo muerto por estación y operario la variable independiente, el método de suministro. La principal contribución es el desarrollo y validación del método KIT CAR un sistema basado en kits únicos que acompañan cada chasis a lo largo de la línea mediante carros especializados. Este enfoque supera a métodos tradicionales como Kanban, JIT, Milk Run y KIT-RACK en los nueve criterios evaluados, integrando principios de lean manufacturing, preparación de kits y flujo continuo. Los resultados demostraron una mejora del 8,57 % en la productividad diaria y una reducción del 31,23 % en el tiempo de inactividad de 27:09 a 19:12 minutos utilizando la prueba t de Student (t = 9,56). Esto permitió fabricar hasta tres unidades más por turno sin necesidad de personal adicional. | |
| dc.description.abstract | Optimizing the supply of materials on automotive assembly lines is one of the greatest challenges facing the manufacturing sector today particularly in Ecuador’s automotive industry, which is undergoing constant restructuring and where production efficiency and waste reduction are key determinants of industrial competitiveness. This study employed a quasi-experimental design using descriptive and explanatory quantitative methodology. The 9 stations of the GWM POER CD 4X2/4X4 chassis line at an Ecuadorian plant were analyzed during March and April 2026, using timing, flowcharts, and direct observation with a confidence level of 94.45%. The dependent variable was downtime per station and operator; the independent variable was the supply method. The main contribution is the development and validation of the KIT CAR method, a system based on unique kits that accompany each chassis along the line via specialized carts. This approach outperforms traditional methods such as Kanban, JIT, Milk Run, and KIT-RACK across the nine evaluated criteria, integrating principles of lean manufacturing, kit preparation, and continuous flow. The results showed an 8.57% improvement in daily productivity and a 31.23% reduction in downtime from 27:09 to 19:12 minutes, as determined by Student’s t-test (t = 9.56). This made it possible to produce up to three additional units per shift without the need for additional staff. | |
| dc.identifier.citation | Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Mecánica | |
| dc.identifier.uri | https://repositorio.uta.edu.ec/handle/123456789/47154 | |
| dc.language.iso | es | |
| dc.publisher | Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Mecánica | |
| dc.subject | KITS | |
| dc.subject | TIEMPO | |
| dc.subject | INACTIVIDAD | |
| dc.subject | PRODUCTIVIDAD | |
| dc.subject | MANUFACTURING | |
| dc.title | Análisis cuantitativo de un nuevo método de suministro para reducir tiempos muertos y mejorar productividad en líneas de ensamble automotor | |
| dc.type | bachelorThesis |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Tesis I.M 940 Moreano Pilatasig Dany Stiven.pdf
- Tamaño:
- 5,58 MB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 1,71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción:
