Sistema de gestión por procesos en el área administrativa con enfoque de sostenibilidad en la EPM-GIDSA.
| dc.contributor.advisor | Aldas Salazar, Darwin Santiago | |
| dc.contributor.author | Ayme Martínez, Jhoselyn Eufemia | |
| dc.contributor.editor | Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial. | |
| dc.date.accessioned | 2026-01-19T21:00:32Z | |
| dc.date.issued | 2026-01 | |
| dc.description | Esta investigación propone el diseño de un sistema de gestión por procesos para el área administrativa de la Empresa Pública Municipal Gestión integral de Desechos Sólidos de Ambato EPM-GIDSA. Este sistema se enfoca en los procedimientos administrativos del macroproceso de Planificación y gestión empresarial con base a la metodología integral para potenciar la articulación entre la planificación y el presupuesto. Asimismo, se fundamenta en los lineamientos de la norma ISO 9001:2015 con el fin de documentar actividades, responsabilidades y objetivos mediante los indicadores que permitan medir el rendimiento y la sostenibilidad de la organización. Para comprender de manera integral la realidad de la empresa inicialmente se analizaron sus prácticas actuales mediante el levantamiento de información. Luego se levantaron los procesos administrativos para entender cómo está organizada la institución, cómo funcionan sus ordenanzas y estatutos, y cómo se relacionan entre sí. Durante este análisis también se aplicaron criterios de sostenibilidad, incorporando indicadores ambientales como consumo energético bajo la ISO 50001, uso de materiales certificados y cumplimiento de normativas ecológicas, así como evidencias económicas y sociales como la existencia de códigos de ética, programas de capacitación y políticas de inclusión laboral. Lo cual permitió no solo diagnosticar los procesos sino hacerlo desde una mirada más responsable. A través del levantamiento de proceso y la elaboración de diagramas de flujo se evidenció la inexistencia de mecanismos de control sobre actividades que se ejecutan dentro de la organización. Por ello se desarrollan indicadores orientados a evaluar, medir y mejorar el desempeño de dichas actividades. Finalmente, la elaboración de los manuales de procedimiento permite a la empresa mejorar significativamente su gestión, al entender cómo se interrelacionan los procedimientos lo cual brinda claridad respecto a la secuencia y los riesgos a los que se encuentra expuesto cada actividad. | |
| dc.description.abstract | This research proposes the design of a Process Management System for the administrative area of the Municipal Public Company for Integral Solid Waste Management of Ambato (EPM-GIDSA). The system focuses on the administrative procedures of the Planning and Business Management macroprocess, based on an integral methodology aimed at strengthening the articulation between planning and budgeting. It is also grounded in the guidelines of ISO 9001:2015 with the purpose of documenting activities, responsibilities, and objectives through indicators that allow measuring organizational performance and sustainability. To fully understand the company’s reality, its current practices were first analyzed through the collection of relevant information. Then, the administrative processes were mapped to identify how the institution is organized, how its ordinances and statutes operate, and how these elements interact with one another. During this assessment, sustainability criteria were also applied, incorporating environmental indicators such as energy consumption under ISO 50001, the use of certified materials, and compliance with ecological regulations. Additionally, economic and social aspects were considered, including the presence of ethical codes, training programs, and inclusive employment policies. This approach allowed not only to diagnose the processes, but to do so from a more responsible and sustainable perspective. Through this process mapping and the development of flowcharts, the absence of control mechanisms over the activities carried out within the organization is identified. Therefore, indicators are developed to evaluate, measure, and improve the performance of these activities. Finally, the preparation of procedures manuals enables the company to significantly enhance its management by clarifying how procedures are interrelated, thus providing greater understanding of the sequence of activities and the risks associated with each one. | |
| dc.identifier.uri | https://repositorio.uta.edu.ec/handle/123456789/46113 | |
| dc.language.iso | es | |
| dc.publisher | Universidad Técnica de Ambato. Facultad de Ingeniería en Sistemas Electrónica e Industrial. Carrera de Ingeniería Industrial. | |
| dc.subject | GESTIÓN POR PROCESOS | |
| dc.subject | PROCEDIMIENTOS ADMINISTRATIVOS | |
| dc.subject | EMPRESA PÚBLICA | |
| dc.subject | MANUAL DE PROCESOS | |
| dc.subject | INDICADORES DE GESTIÓN. | |
| dc.title | Sistema de gestión por procesos en el área administrativa con enfoque de sostenibilidad en la EPM-GIDSA. | |
| dc.type | Thesis |
