Optimización del sistema de distribución de agua potable del barrio “Cuilche Miño”, cantón Latacunga para garantizar la eficiencia del servicio
| dc.contributor.advisor | Maldonado Narváez Lenin Rafael | |
| dc.contributor.author | Toaquiza Pila Anderson Israel | |
| dc.date.accessioned | 2025-07-31T16:59:25Z | |
| dc.date.issued | 2025 | |
| dc.description | El presente proyecto técnico se desarrolló en el barrio Cuilche Miño, perteneciente a la parroquia San Juan de Pastocalle, cantón Latacunga, provincia de Cotopaxi. El sistema de distribución de agua potable (SDAP) del sector fue construido en 2003 para 95 usuarios; sin embargo, actualmente abastece a 225, superando ampliamente su capacidad original. Esta situación, sumada al próximo cumplimiento del periodo de diseño del sistema (25 años) y a las ampliaciones ejecutadas sin planificación técnica, ha generado deficiencias operativas como sobrepresiones, bajas velocidades e inadecuada calidad del servicio. Es por ello, que se presentó la necesidad de un estudio detallado y una solución viable para este sector. Se inició con la recopilación de información base, incluyendo el levantamiento topográfico mediante RTK y el catastro detallado de la infraestructura existente. Posteriormente, se evaluó toda la infraestructura hidráulica de la red para conocer su estado actual; además, mediante modelación hidráulica computacional bajo condiciones estáticas y dinámicas, se identificaron deficiencias como sobrepresiones, velocidades inadecuadas y nodos conflictivos. Finalmente, se abordó la propuesta de optimización, sustentada en criterios normativos que incluyó el diseño hidráulico detallado, el análisis de precios unitarios y el presupuesto referencial de inversión. Durante el diagnóstico se identificó el deterioro físico de componentes clave del sistema. La modelación hidráulica evidenció sobrepresiones en la mayoría de los nodos y velocidades bajas en gran parte de la red. Por ello, se propuso un rediseño integral del SDAP con un periodo de diseño de 25 años y una población futura estimada de 1242 habitantes. La nueva red contempla 12,78 km de tuberías de PVC que cubren una superficie total de 180 Ha. Además, se logró un desempeño eficiente: el 98% de los nodos y más del 78% de las tuberías operan dentro de los rangos técnicos establecidos por normativa nacional, controlando sobrepresiones y velocidades excesiva para asegurar un servicio de calidad, continuo y sostenible para el barrio “Cuilche Miño”. | |
| dc.description.abstract | This technical project was carried out in the neighborhood of Cuilche Miño, located in the parish of San Juan de Pastocalle, Latacunga canton, Cotopaxi province. The potable water distribution system (PWDS) in the area was built in 2003 to serve 95 users; however, it currently supplies 225 users, far exceeding its original design capacity. This situation, along with the imminent end of the system’s design life (25 years) and the unplanned expansions executed without technical oversight, has led to operational deficiencies such as overpressures, low flow velocities, and inadequate service quality. Therefore, a detailed study and a viable solution for this sector became necessary. The process began with the collection of baseline information, including a topographic survey using RTK and a detailed inventory of the existing infrastructure. Subsequently, the entire hydraulic infrastructure of the network was evaluated to determine its current condition. Additionally, through computational hydraulic modeling under static and dynamic conditions, deficiencies such as overpressures, inadequate velocities, and critical nodes were identified. Finally, an optimization proposal was developed, based on regulatory criteria, which included a detailed hydraulic design, unit price analysis, and a referential investment budget. The diagnostic phase identified physical deterioration in key components of the system. The hydraulic modeling showed overpressures in most nodes and low velocities in a large portion of the network. As a result, a comprehensive redesign of the PWDS was proposed, with a 25- year design period and a projected future population of 1242 inhabitants. The new network includes 12.78 km of PVC pipelines, covering a total area of 180 hectares. Furthermore, efficient performance was achieved: 98% of nodes and over 78% of pipelines operate within the technical parameters established by national regulations, effectively controlling overpressures and excessive velocities to ensure a high-quality, continuous, and sustainable service for the Cuilche Miño neighborhood. | |
| dc.identifier.uri | https://repositorio.uta.edu.ec/handle/123456789/45221 | |
| dc.language.iso | es | |
| dc.publisher | Ingeniería Civil y Mecánica. Carrera Ingeniería Civil | |
| dc.subject | AGUA POTABLE | |
| dc.subject | SISTEMA DE DISTRIBUCIÓN | |
| dc.subject | DISEÑO HIDRÁULICO | |
| dc.subject | MODELACIÓN HIDRÁULICA | |
| dc.title | Optimización del sistema de distribución de agua potable del barrio “Cuilche Miño”, cantón Latacunga para garantizar la eficiencia del servicio | |
| dc.type | bachelorThesis |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Tesis I.C. 2067 - Anderson Israel Toaquiza Pila.pdf
- Tamaño:
- 23,55 MB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 1,71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: