Mejoramiento de la vía que une el sector Huapante Chico, hasta el Barrio San Isidro - Andagualo, Parroquia de San Andrés del Cantón Santiago de Píllaro Tungurahua con la finalidad de mejorar la vialidad del sector
| dc.contributor.advisor | Moya Medina Dilón Germán | |
| dc.contributor.author | Saquinga Calapiña Jimmy Stalin | |
| dc.contributor.editor | Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil | |
| dc.date.accessioned | 2026-01-15T21:51:22Z | |
| dc.date.issued | 2026-01-15 | |
| dc.description | El presente proyecto propone el mejoramiento del trazado vial que une el sector Huapante Chico con el Barrio San Isidro – Andagualo, ubicado en la Parroquia San Andrés del Cantón Santiago de Píllaro, Provincia de Tungurahua; el tramo de intervención tiene una longitud aproximada de 4,3 kilómetros, el proyecto busca mejorar las condiciones de transitabilidad de esta importante arteria tomando en cuenta que favorece la salida de los productos agrícolas de la zona hacia los mercados cantonales y provinciales. Actualmente, la vía presenta un deterioro visible de la capa asfáltica, generando condiciones poco favorables para el tránsito continuo y seguro de los vehículos. El objetivo define una solución geométrica y estructural que asegura servicio continuo y soporte la demanda futura. La metodología incluyó levantamiento topográfico con GNSS, inventario, en donde se registraron 2444 puntos y se confirmó un terreno montañoso con pendientes fuertes; en el conteo del tráfico por siete días se obtuvo un promedio diario actual con un TPDA total de 355 vehículos por hora y con una proyección a 20 años de 981 vehículos por día; en los ensayos de laboratorio se identificó que tres de cinco muestras fueron limos arenosos de baja plasticidad ML y A - 4, una nuestra de arena arcillosa SC y A-4 y una arena limosa SM y A-2-4, con CBR entre 5,2% y 14,2%. Tomando en cuenta los resultados se rediseñó el trazado horizontal, vertical y la sección para ello se planteó con dos carriles de 3 metros, espaldones de 0.5 a los dos lados de la vía, bombeo de -2%, cunetas triangulares de 1.11 metros de ancho por 0.3 m de alto, taludes de corte con una relación H: V (1:1) y talud de relleno con una relación V:H (1:1.5). El pavimento flexible incluye carpeta asfáltica de 10 cm, una base de 15 cm y una subbase de 20 cm, con un espesor total de 45 centímetros y un presupuesto referencial de 1 697 706,04 dólares. Se concluye que la propuesta mejora la conectividad, incrementa la seguridad vial y favorece el desarrollo social y económico del sector. | |
| dc.description.abstract | The current project proposes the improvement of the road alignments that connects the Huapante Chico zone with the San Isidro – Andagualo neighborhood located in the San Andrés district of the Santiago de Píllaro city, Tungurahua province. The intervention section has an approximate length of 4.3 kilometers. The project aims to improve the traffic flow conditions of this crucial and primary mobility artery, considering that this roadway facilitates the transportation of farm products from the local area to the main markets of the city and the province. Currently, the road visualizes a significant deterioration over its asphalt surface layer which in short term generates adverse conditions for the safe and uninterrupted vehicle traffic. The main objective is to define a geometrical and structured solution that ensures continuous service and the capacity to meet future demand. The methodology used includes topographic surveying using GNSS, and an inventory in which 2,444 points were recorded, a mountainous land with steep slopes were also confirmed as well. A seven-day vehicles circulation test was held and as a result it was realized that an average of 355 vehicles per hour pass by the roadway daily and it was projected that within the latest 20 years a number of 981 vehicles will pass by per day. All the projections were developed using TPDA. A laboratory test also identifies that three out of the five samples were sandy silts of low density (ML & A - 4), one sample of clayey sand (SC and A-4), and one silty sand (SM and A-2-4), with CBR values ranging from 5.2% to 14.2%. Considering the results, a horizontal and vertical alignment and the road section were redesigned. The proposal includes two 3-meter lanes, 0.5-meter shoulders on both sides of the road, a −2% cross slope, triangular ditches measuring 1.11 meters wide by 0.3 meters deep, cut slopes with an H:V ratio of 1:1, and fill slopes with a V:H ratio of 1:1.5. The structure of the flexible pavement includes a 10-cm asphalt surface, a 15-cm base layer, and a 20-cm subbase, giving a total thickness of 45 centimeters, with a referential budget of USD 1,697,706.04. It was concluded that the road fosters socio-economic progress of the region and improves accessibility and safety | |
| dc.identifier.citation | Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil | |
| dc.identifier.uri | https://repositorio.uta.edu.ec/handle/123456789/45962 | |
| dc.language.iso | es | |
| dc.publisher | Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil | |
| dc.subject | MEJORAMIENTO VIAL | |
| dc.subject | PAVIMENTO FLEXIBLE | |
| dc.subject | SUELOS | |
| dc.title | Mejoramiento de la vía que une el sector Huapante Chico, hasta el Barrio San Isidro - Andagualo, Parroquia de San Andrés del Cantón Santiago de Píllaro Tungurahua con la finalidad de mejorar la vialidad del sector | |
| dc.type | bachelorThesis |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Tesis I.C 2083 Saquinga Calapiña Jimmy Stalin.pdf
- Tamaño:
- 43,01 MB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 1,71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción:
