Optimización de la Geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 4+875 – 9+750 perteneciente a la Provincia Tungurahua
| dc.contributor.advisor | Aldás Sánchez Milton Rodrigo | |
| dc.contributor.author | Naula Calo Katerin Mishel | |
| dc.date.accessioned | 2025-07-30T21:15:32Z | |
| dc.date.issued | 2025 | |
| dc.description | El presente proyecto técnico responde a la necesidad de mejorar las condiciones de infraestructura vial y garantizar una movilidad eficiente y segura para los usuarios que transitan entre las abscisas 4+875 y 9+750, dentro del área urbana de la ciudad de Píllaro. El objetivo principal es optimizar los tiempos de desplazamiento vehicular, contribuyendo al fortalecimiento del desarrollo económico y turismo en las zonas intervenidas y sus áreas de influencia, mediante la aplicación de criterios de diseño que cumplan con los estándares técnicos vigentes. El desarrollo del proyecto se estructuró en tres fases técnicas fundamentales. La primera fase correspondió a los estudios preliminares, los cuales comprendieron actividades de campo como el levantamiento topográfico y el conteo vehicular, necesarios para la estimación de Tráfico promedio diario anual de la vía. En la segunda fase, se llevaron a cabo los estudios de suelo, aplicando tanto ensayos destructivos como no destructivos con el objetivo de caracterizar las propiedades físicas y mecánicas del suelo, así como medir las deflexiones estructurales del pavimento. Con los datos obtenidos, la tercera fase consistió en el rediseño geométrico de la vía, considerando el nuevo TPDA proyectado, las condiciones del terreno y los requisitos normativos vigentes. Se determinaron los elementos del diseño horizontal, vertical y trasversal, y se complementó con la elaboración de un presupuesto referencial que contempla los costos asociados a la construcción garantizando la visibilidad técnica y económica del proyecto. El análisis topográfico evidenció que el tramo vial se desarrolla sobre un terreno montañoso con pendientes pronunciadas, mientras que el estudio de tránsito permitió clasificar la vía como Clase I. En cuanto al suelo, los ensayos de laboratorio identificaron un material arenoso limoso, con un CBR promedio de 19,14%, adecuado para funcionar como subrasante estructural. Finalmente, los resultados de las deflexiones indicaron que los tramos iniciales necesitan rehabilitación de la vía Con los resultados obtenidos se rediseño la vía con una estructura de pavimento de 4.5 cm de carpeta asfáltica, 15 cm de base y 20 cm de subbase, también la nueva sección transversal de 7.3 de ancho total del carril adicionalmente de cunetas y bordillos. Finalmente, del presupuesto referencial calculado para este proyecto fue de $ 1,433,298.56dólares. | |
| dc.description.abstract | This technical project responds to the need to improve road infrastructure conditions and ensure efficient and safe mobility for users traveling between the abscissas 4+875 and 9+750, within the urban area of the city of Píllaro. The main objective is to optimize vehicle travel times, contributing to the strengthening of economic development and tourism in the affected areas and their areas of influence, through the application of design criteria that comply with current technical standards. The project development was structured into three fundamental technical phases. The first phase consisted of preliminary studies, which included field activities such as topographic surveys and vehicle counts, necessary for estimating the road's average daily annual traffic. In the second phase, soil studies were carried out, applying both destructive and non-destructive tests to characterize the physical and mechanical properties of the soil, as well as measure the structural deflections of the pavement. With the data obtained, the third phase consisted of the geometric redesign of the road, considering the new projected TPDA, the terrain conditions, and current regulatory requirements. The horizontal, vertical, and transversal design elements were determined, complemented by the preparation of a reference budget that includes the costs associated with construction, ensuring the technical and economic viability of the project. The topographic analysis showed that the road section runs over mountainous terrain with steep slopes, while the traffic study classified the road as Class I. Regarding the soil, laboratory tests identified a silty sandy material, with an average CBR of 19.14%, suitable for use as a structural subgrade. Finally, the deflection results indicated that the initial sections require road rehabilitation. Based on the results, the roadway was redesigned with a pavement structure of 4.5 cm of asphalt, 15 cm of base, and 20 cm of subbase. The new cross section was also 7.3 cm wide, along with gutters and curbs. The estimated reference budget for this project was $1,731,993.21 | |
| dc.identifier.uri | https://repositorio.uta.edu.ec/handle/123456789/45158 | |
| dc.language.iso | es | |
| dc.publisher | Ingeniería Civil y Mecánica. Carrera Ingeniería Civil | |
| dc.subject | REDISEÑO GEOMÉTRICA | |
| dc.subject | VÍA | |
| dc.subject | ENSAYOS DE SUELO | |
| dc.subject | MTOP | |
| dc.title | Optimización de la Geometría de la vía desde el puente Yanayacu hasta Píllaro entre las abs 4+875 – 9+750 perteneciente a la Provincia Tungurahua | |
| dc.type | bachelorThesis |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Tesis I.C. 2062 - Katerin Mishel Naula Calo.pdf
- Tamaño:
- 36,17 MB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 1,71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: