Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 2 de 2
  • Item type:Ítem,
    Evaluación de dos Métodos de Sectorización y Turnos de Riego en el Sector Santa Lucía, del Cantón Tisaleo.
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Maestría en Hidráulica con mención en Obras Hidráulicas., 2025-11-26)
    Aroca Farfán, David Israel
    ;
    Bayas Altamirano, Myriam Marisol
    A comparative evaluation of two sectorization methods and turn of irrigation in the Santa Lucía sector, Tisaleo canton. The evaluated methods were block sectorization and modular sectorization, each with its advantages and disadvantages. Modular sectorization proved to be favorable in terms of flexibility and organization of irrigation scheduling, allowing for a more adaptable and staggered use of water resources. This approach facilitates a more homogeneous distribution of irrigation over time, optimizing system operation and reducing the risk of overloading the distribution network. Conversely, block sectorization enables the use of the total available flow in a single shift, as it involves a smaller number of plots irrigating simultaneously. This method can be advantageous in contexts where it is necessary to maximize the instantaneous use of water resources, or where the existing infrastructure is designed to operate at full capacity during specific intervals. The selection of the most appropriate sectorization method will depend on numerous factors specific to the operational and geographical context of the irrigation system. Key determining criteria include implementation and maintenance costs, the existing hydraulic infrastructure, the level of automation and available technology, as well as the agronomic and climatic characteristics of the area.
  • Item type:Ítem,
    Elaboración de un plan hidráulico de contingencia para heladas en el proyecto de riego colectivo tecnificado Tunga – San Pedro, Acequia Mocha Huachi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Maestría en Hidráulica con mención en Obras Hidráulicas., 2025)
    Quinga Mayorga Christian Javier
    ;
    Morales Fiallos Rodrigo Fabián
    The objective of this study was to develop a hydraulic contingency plan for frost in the Tunga - San Pedro collective irrigation project, Acequia Mocha Huachi. The project is located at coordinates X: 765,500 Y: 9,849,000, has 125.67 ha distributed in 344 lots belonging to 216 families located in 10 irrigation sectors, of this area there are 8.50 ha (6.76%) without water use rights, 9.52 ha with drip irrigation (7.58%) and 107.65 ha (85.66%) with sprinkler irrigation. The proposal was to prepare: Cadastral update, hydraulic distribution diagrams, maps of ice-producing sites, maps of crops susceptible to frost, hydraulic simulation in IRRICAD and a proposal for opening hydrants. The hydraulic diagram defined an oversizing of the main pipeline, where, for the 9 irrigation sectors, a flow of 140.99 l/s can be carried by means of the operation of a 4,200 m3 buffer reservoir, while the operating flow rate is 56.33 l/s (282 sprinklers with a flow rate of 0.2 l/s). In addition, sector 10, which operates through a forebay, has an operating flow rate of 5 l/s (25 sprinklers). It is worth mentioning that, there are 65.75 ha that are susceptible to frost, said surface area is distributed mostly in sectors 2 and 10, in this sense, the ice-making lots are 153 (50.50%). In addition, the most susceptible crops (strawberry, corn, blackberry and potatoes) to frost are present in 26.94 ha (22.99%), moderately susceptible crops (peas, onions, fruit trees, beans and carrots) are found in 19.98 ha (17.05%) and the least susceptible crops (alfalfa, grass and fallow land) with 70.25 ha (59.96%). The hydraulic contingency plan for sectors 1 through 9 is to open 18 lots with a flow rate of 52.20 l/s, with 261 sprinklers operating simultaneously, covering 3.19 ha. For sector 10, the flow rate is 4.60 l/s, with 23 sprinklers operating simultaneously, and a surface area of 0.28 ha. The proposed hydraulic contingency plan is based on seven shifts for sectors 1 through 9 and 17 shifts for sector 10, each with 10-minute openings