Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 9 de 9
  • Item type:Ítem,
    Optimización de la red de distribución de agua potable del sector Cruz de Mayo de la junta regional Nueva Vida, cantón Quero, provincia de Tungurahua
    (Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil, 2026-01-14)
    Arroba Sánchez Kevin Giovanni
    ;
    Soria Pugo María Gabriela
    ;
    Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil
    The present degree work was carried out in the Cruz de Mayo neighborhood, located in the Quero canton, in the province of Tungurahua. The potable water distribution system currently operating in this sector was built approximately 40 years ago, without prior technical studies or formal planning processes. Initially, the infrastructure was designed solely to supply the Cruz de Mayo and San Antonio neighborhoods; however, over time it was expanded empirically to also provide water to the Yayulihui neighborhood. In the specific case of Cruz de Mayo, the system serves 143 users, which has generated operational limitations: excessively high pressures in the final sections, low pressures in critical points, reduced velocities that promote sedimentation, and in general, a performance that does not respond to the current demographic growth. These conditions justify the need to optimize the system, and this project represents the first technical step toward achieving it. To address this, information was collected regarding the physical and operational conditions of the main components: the chlorination tank, storage tank, pipeline network, pressurereducing tanks, and valves. This assessment made it possible to identify natural infrastructure deterioration and the points where system operation is compromised. Additionally, a topographic survey was carried out through photogrammetry, enabling the generation of a 4.3 km² surface model and the georeferencing of system elements and household connections. The hydraulic parameters required for modeling were also compiled, including pipeline diameters and layout through field inspections, and demands obtained from monthly consumption records. With this information, a hydraulic model of the existing system was developed using WaterCAD software, allowing for an evaluation of its real performance. The results show that only 59.46% of the nodes operate within the normative pressure range, and only 8.89% of the pipes present adequate velocities, confirming the need for technical intervention. Based on this diagnosis, two optimization alternatives were proposed. The first maintains most of the existing infrastructure and intervenes only in the most critical sectors, achieving an optimization of 37.31% of the system. This proposal significantly improves hydraulic parameters, reaching 90.48% of nodes within the normative range and 32% of pipes operating with adequate velocities. The second alternative proposes a redesign of the layout, relocating the network towards public roads in accordance with current regulations. This approach xviii requires intervening 85.86% of the system and results in 92.86% of nodes within the permitted pressure range and 38.78% of pipes operating at adequate velocities.
  • Item type:Ítem,
    Optimización del sistema de distribución de agua potable del barrio “Cuilche Miño”, cantón Latacunga para garantizar la eficiencia del servicio
    (Ingeniería Civil y Mecánica. Carrera Ingeniería Civil, 2025)
    Toaquiza Pila Anderson Israel
    ;
    Maldonado Narváez Lenin Rafael
    This technical project was carried out in the neighborhood of Cuilche Miño, located in the parish of San Juan de Pastocalle, Latacunga canton, Cotopaxi province. The potable water distribution system (PWDS) in the area was built in 2003 to serve 95 users; however, it currently supplies 225 users, far exceeding its original design capacity. This situation, along with the imminent end of the system’s design life (25 years) and the unplanned expansions executed without technical oversight, has led to operational deficiencies such as overpressures, low flow velocities, and inadequate service quality. Therefore, a detailed study and a viable solution for this sector became necessary. The process began with the collection of baseline information, including a topographic survey using RTK and a detailed inventory of the existing infrastructure. Subsequently, the entire hydraulic infrastructure of the network was evaluated to determine its current condition. Additionally, through computational hydraulic modeling under static and dynamic conditions, deficiencies such as overpressures, inadequate velocities, and critical nodes were identified. Finally, an optimization proposal was developed, based on regulatory criteria, which included a detailed hydraulic design, unit price analysis, and a referential investment budget. The diagnostic phase identified physical deterioration in key components of the system. The hydraulic modeling showed overpressures in most nodes and low velocities in a large portion of the network. As a result, a comprehensive redesign of the PWDS was proposed, with a 25- year design period and a projected future population of 1242 inhabitants. The new network includes 12.78 km of PVC pipelines, covering a total area of 180 hectares. Furthermore, efficient performance was achieved: 98% of nodes and over 78% of pipelines operate within the technical parameters established by national regulations, effectively controlling overpressures and excessive velocities to ensure a high-quality, continuous, and sustainable service for the Cuilche Miño neighborhood.
  • Item type:Ítem,
    Optimización del sistema de distribución de agua potable del barrio central del caserío Yanahurco, cantón Mocha, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2025-02)
    Campaña Marcalla, Kevin Rolando
    ;
    Peñafiel Valla, Lourdes Gabriela
    The drinking water distribution network of the Yanahurco Village has exceeded its operational useful life, showing critical deficiencies in the hydraulic supply, particularly in pressure, as a consequence of the population increase and the incorporation of new housing units. The present study was oriented towards the diagnostic evaluation and functional optimization of the system, with the objective of guaranteeing a reliable and continuous service. On-site technical inspections were carried out to obtain primary data through surveys and direct measurements. An average supply flow of 8.95 L/s was determined, and pressures were recorded at strategic points using a manometer. The results showed significant disparities: in peripheral areas, the pressure reached a maximum of 64 m.c.a. (meters of water column), while in other sectors the values remained within the normative parameters, which confirms a critical hydraulic imbalance. To validate these observations, the system was modeled using hydraulic software, analyzing static and dynamic scenarios. The results confirmed substantial problems in nodal pressures and flow rates along the main pipelines. As an improvement strategy, the redesign of the network was proposed, with a design flow rate of 11.48 L/s. Incorporating infrastructure upgrades, with pipes of progressive diameters (22 mm, 32 mm, 40 mm, 50 mm and 63 mm) and the installation of eight pressure regulating valves (PVR), achieving stabilization of system pressures. However, flow rates were not fully optimized because the main pipeline, renovated five years ago, was not modified. Instead, four purge valves (PBV) were installed to eliminate air accumulations, improve flow continuity and mitigate sedimentation risks. Finally, a financial analysis of the project was performed, determining a total implementation cost of $156,348.81. This proposal ensures the sustainability and hydraulic efficiency of the system for the community of Caserío Yanahurco.
  • Item type:Ítem,
    Optimización del sistema de distribución de agua potable, de la comunidad Andahualo Alto San Isidro, parroquia San Andrés, cantón Píllaro, provincia Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Sangucho Quinaucho, Erick Joel
    ;
    Peñafiel Valla, Lourdes Gabriela
    At present the system does not provide a service of quality, continuity and efficiency, because it has been operating for 29 years and is at the limit of its useful life, in order to optimize the system this research is carried out. It began with a topographic survey, using the photogrammetry technique, technical visits were made in the field, where the physical evaluation of the state of the components of the system was carried out. Subsequently, the hydraulic evaluation was developed where, with the help of a pressure gauge, the pressures in the different connections were known and the system was modeled with the help of hydraulic simulation software in both static and dynamic conditions. After analyzing the deficiencies, it was concluded that a redesign proposal is necessary. A proposal was made to redesign the system, which is made up of a 5.11km pipeline network for a design period of 25 years and covers an area of 86.60ha of surface. The design was carried out under static and dynamic modeling in the most critical conditions, based on design parameters that comply with national regulations for the rural sector. As a result, the project contains evaluation matrices, calculation report, network plans, implementation of pressure-reducing valves and a water disinfection system, along with a technical economic analysis that includes a referential budget for the execution of the project.
  • Item type:Ítem,
    Optimización del sistema de distribución de agua potable del barrio Mariscal Sucre Los Puentes, parroquia Saquisilí, cantón Saquisilí, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Calvopiña Tenorio, Cristian Andrés
    ;
    Peñafiel Valla, Lourdes Gabriela
    Currently, the SDAP of the town is nearing the end of its 30 years design period. This has caused the system to present deficiencies and deterioration, causing overpressure and leaks, compromising the quality, quantity and continuity of the water supply. In addition, population growth and expansion have generated a deficient distribution of the network. Therefore, a proposal was developed to guarantee efficient use of the resource by improving and optimizing the system. This began with a comprehensive evaluation of the network, technically analyzing its physical condition by recording technical and hydraulic data sheets using a pressure gauge to measure pressure efficiency. The population register was updated by means of surveys to diagnose overcrowding, socioeconomic and sanitary conditions. Subsequently, a topographic survey was carried out using the photogrammetry technique. After data collection, the infrastructure was modeled and the system was analyzed using simulation software under static and dynamic conditions. The critical scenario of maximum hourly consumption was considered and the characteristic consumption pattern of the area was determined. The results indicated the need for a complete redesign. The improvement proposal contains the diagnosis of the current deficiencies, design of a system to meet future needs for the 30 years period, implementation of water quality improvements, optimization of the hydraulic parameters of the network, and cost-effective solutions.
  • Item type:Ítem,
    Mejoramiento del sistema de distribución de agua potable de la cabecera parroquial de san francisco del cantón Tisaleo provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Alvarado Angamarca, Cinthya Lizeth
    ;
    Moya Medina, Dilon Germán
    Currently, the distribution system in San Francisco parish does not provide quality service even though it is practically new. On the other hand, the distribution system does not completely cover the parish, causing the inhabitants to look for other sources of supply. The present project has been carried out to improve and expand the system. Initially, the study area was delimited by means of the canton's cadastre, then a topographic survey was carried out with the help of an RTK. With the georeferenced plans of the existing potable water system, the system was evaluated and it was found that the storage tank of the study parish had a conduction network that fed the tank of the San Luis parish, so this parish was also analyzed. An evaluation was made both physically and hydraulically where deficiencies were found. Then, the existing system was modeled for scenarios in static and dynamic state, resulting that the two parishes presented problems of velocities and pressures. In the proposal to improve the existing system and expand it, two pressure regulating valves were installed in San Francisco parish and three pressure regulating valves were installed in San Luis three pressure regulating valves were installed, which optimized the pressures to 100 percent. The velocities in the two sectors were not optimized to 100 percent, so it was suggested that bleed valves be installed. Finally, a budget and schedule were prepared.
  • Item type:Ítem,
    Mejoramiento de la red de distribución de agua potable para optimizar la calidad sanitaria del caserío El Rosal del cantón Mocha, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-01)
    Guashpa Lema, Danny Miguel
    ;
    Paredes Beltrán, Bolívar Eduardo
    Due to the need of the inhabitants to have a drinking water supply system, important to improve the quality of life, the necessary studies are carried out for the correct supply of the vital liquid throughout the sector. The design of the proposal for a drinking water distribution system was carried out and the evaluation of the existing network was carried out, current information was collected from the areas involved, such as: population, topographic survey, survey of the current network, approximate pipe diameters. , distribution flow and dimension of the existing storage tank, in order to determine its current situation, where the new flow determined through the respective calculations will travel, including a storage tank that can fulfill the projected requirements, complying with the current rules and regulations. The drinking water distribution network and the storage tank were designed for a period of 30 years. The evaluated network has sections of galvanized iron pipe, segments with PVC pipe and branches with black hose. The new network is designed entirely of PVC pipes of different diameters with a total of 7,032 kilometers, which were modeled and calculated by specialized software. The projected flow to supply the population corresponds to 3.67 lt/sec. and as products, plans of the distribution system, the storage tank, reference budget, unit price analysis, technical specifications and an estimated work schedule were generated.
  • Item type:Ítem,
    Optimización del sistema de distribución de agua potable del barrio Mollepamba, parroquia Saquisilí, cantón Saquisilí, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-09)
    Moreno Remache, Kevin Alejandro
    ;
    Peñafiel Valla, Lourdes Gabriela
    At present, the Mollepamba neighborhood, in the Saquisilí canton, has a gravity distribution system which is not working correctly, because it is about to reach its useful life of 25 years, which has brought overpressure failures in the pipes due to the fact that they do not have pressure regulating valves and deterioration in the distribution tank. It started with a topographic survey of the entire neighborhood, with the help of a drone and RTK, applying the photogrammetry technique. Site visits were made to assess the conditions of the land, the reserve tank and the pipes that carry the water. The distribution system was modeled with the help of simulation software (EPANET) in a static and dynamic state, for which it was identified that there are deficiencies, for which it was determined that it would be necessary to propose an optimization in the existing design. The drinking water distribution system is made up of a length of 4.33 km of pipes, which are distributed throughout the neighborhood, the sector has an area of 50 ha of land, its hydraulic design was carried out under static and dynamic scenarios, based on design parameters in accordance with national regulations. The project includes evaluation matrices, calculation memory, network plans, and the implementation of reducing valves; in addition to a technical-economic analysis in which a referential budget and technical specifications are presented.
  • Item type:Ítem,
    Mejoramiento y optimización del sistema de distribución de agua potable del casco central de la parroquia San Antonio de Pasa, cantón Ambato, provincia Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-01)
    Ortiz Mayorga, Melissa Lissette
    ;
    Pérez Lara, Rosana Mabel
    ;
    Paredes Beltrán, Bolívar Eduardo
    Currently, the drinking water distribution system of the central area of the rural parish of San Antonio de Pasa does not offer a quality, continuity and efficiency service, mainly due to its obsolescence since it has been operating for more than 60 years, for which the present project develops a proposal for its improvement and optimization. It began with the collection of general information about the system, updating of the user register and, in addition, a topographic survey was effectuated using photogrammetry. Proceeding from this, a physical evaluation was carried out through inspections of the total infrastructure and a hydraulic evaluation, in which the system was modeled and analyzed in a simulation software in static and dynamic states in the critical scenario of maximum hourly consumption. After the evaluation and identification of deficiencies, it was determined that a redesign proposal is necessary. The proposed distribution system is made up of two networks with a total length of 14.84 km, proportionally divided into length, area and population, which cover a total area of 138.32 Ha. Its hydraulic design was carried out under static and dynamic scenarios under conditions critical consumption, based on design parameters in accordance with national regulations for the rural sector. The project includes evaluation matrices, calculation memory and plans of the network, of pressure break tanks and of the disinfection system; in addition to a technical-economic analysis made up of the referential budget, valued work schedule and technical specifications.