Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 6 de 6
  • Item type:Ítem,
    Diseño del pavimento y mejoramiento de la vía Tanicuchí – Santa Ana Alto – ingreso a Pastocalle, cantón Latacunga, provincia de Cotopaxi
    (Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil, 2026-07-01)
    Correa Villalva Alan Josué
    ;
    Aldás Sánchez Milton Rodrigo
    ;
    Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil
    This work presents the flexible pavement design and improvements for the Tanicuchi - Santa Ana Alto – Ingreso a Pastocalle road, located in the province of Cotopaxi. This proposal addresses the deterioration of the current road infrastructure, which restricts local transport and limits the productivity of agricultural, livestock, and floricultural activities in the area. Chapter I compiles the theoretical, regulatory, and technical foundations regarding geometric design, pavements, traffic, geotechnics, drainage, and road signaling, ensuring the necessary technical support for the project. Chapter II details the applied methodology, integrating topographies, traffic studies, soil testing, hydrological and hydraulic analysis, pavement dimensioning, road signaling, cost analysis, and budgeting. Chapter III presents the results of the field studies and designs: a 5.725 km road section was defined, utilizing 2,657 surveyed topographic points and featuring maximum slopes of 8%. The traffic analysis determined a design ADTT (Average Daily Total Traffic) of 164 vehicles/day and a 20-year projection of 317 vehicles/day. The subgrade was identified as silty sand, adopting a design CBR of 11.80%. Using the AASHTO 93 methodology, the pavement structure was designed with a 5 cm asphalt concrete surface course, a 15 cm class 4 granular base, and a 20 cm class 3 sub-base. Finally, Chapter IV presents the definitive design of the flexible pavement wearing course, a proposal that optimizes road functionality, drainage, and safety, with a reference budget of USD 1,077,336.31.
  • Item type:Ítem,
    Mejoramiento de la vía que une el sector Huapante Chico, hasta el Barrio San Isidro - Andagualo, Parroquia de San Andrés del Cantón Santiago de Píllaro Tungurahua con la finalidad de mejorar la vialidad del sector
    (Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil, 2026-01-15)
    Saquinga Calapiña Jimmy Stalin
    ;
    Moya Medina Dilón Germán
    ;
    Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil
    The current project proposes the improvement of the road alignments that connects the Huapante Chico zone with the San Isidro – Andagualo neighborhood located in the San Andrés district of the Santiago de Píllaro city, Tungurahua province. The intervention section has an approximate length of 4.3 kilometers. The project aims to improve the traffic flow conditions of this crucial and primary mobility artery, considering that this roadway facilitates the transportation of farm products from the local area to the main markets of the city and the province. Currently, the road visualizes a significant deterioration over its asphalt surface layer which in short term generates adverse conditions for the safe and uninterrupted vehicle traffic. The main objective is to define a geometrical and structured solution that ensures continuous service and the capacity to meet future demand. The methodology used includes topographic surveying using GNSS, and an inventory in which 2,444 points were recorded, a mountainous land with steep slopes were also confirmed as well. A seven-day vehicles circulation test was held and as a result it was realized that an average of 355 vehicles per hour pass by the roadway daily and it was projected that within the latest 20 years a number of 981 vehicles will pass by per day. All the projections were developed using TPDA. A laboratory test also identifies that three out of the five samples were sandy silts of low density (ML & A - 4), one sample of clayey sand (SC and A-4), and one silty sand (SM and A-2-4), with CBR values ranging from 5.2% to 14.2%. Considering the results, a horizontal and vertical alignment and the road section were redesigned. The proposal includes two 3-meter lanes, 0.5-meter shoulders on both sides of the road, a −2% cross slope, triangular ditches measuring 1.11 meters wide by 0.3 meters deep, cut slopes with an H:V ratio of 1:1, and fill slopes with a V:H ratio of 1:1.5. The structure of the flexible pavement includes a 10-cm asphalt surface, a 15-cm base layer, and a 20-cm subbase, giving a total thickness of 45 centimeters, with a referential budget of USD 1,697,706.04. It was concluded that the road fosters socio-economic progress of the region and improves accessibility and safety
  • Item type:Ítem,
    Rediseño geométrico y diseño estructural de pavimento de la vía Belen Cuatro Esquinas – Bellavista de Cusubamba desde la abscisa 0+000 – 5+000, ubicada en la parroquia Cusubamba, cantón Salcedo, provincia de Cotopaxi
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Jiménez Mogro, Alex Javier
    ;
    Bayas Altamirano, Myriam Marisol
    In recent years, Ecuador has tried to improve its competitiveness compared to other countries in its road infrastructure, however, not all areas of the country have managed to optimize their road network. Without going any further, the quality of the Cotopaxi Road network has been overshadowed by its neighboring provinces, which is why the need arises to address new projects that contribute to the evolution of the infrastructure. To contribute to this objective, road studies were carried out following the processes dictated by the MTOP 2003 regulations. Starting with the survey of the topographic strip using an RTK device that revealed that the road was in mountainous terrain. The traffic study indicated that the TPDA for a design period of 20 years would be 778 vehicles/day, classifying the road as a CLASS III collector. With this information, the geometric redesign was carried out, adjusting the existing road to a new layout that complies with the parameters suggested by the standard and also without exceeding very large cut and fill areas. The structural package was designed based on the AASHTO-93 Method using the design CBR obtained in the soil study, finally the minimum and recommended thicknesses for subbase, base and asphalt layer are configured. Finally, the road design proposal was evaluated, and an estimated budget was developed, providing a clear view of the resources required and facilitating accurate planning for future project implementation.
  • Item type:Ítem,
    Mejoramiento de la vía que une las comunidades de San Vicente y Wambula de la parroquia Archidona, cantón Archidona, provincia de Napo”
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Tobar Ledesma, Jefferson Aldair
    ;
    Cañizares Proaño, Byron Genaro
    The road improvement project connecting the communities of San Vicente and Wambula is a key initiative for regional development. However, the inadequate current road infrastructure has limited economic growth and social integration, negatively affecting access to markets and services. This road is essential for the local economy, especially for transporting agricultural products such as cocoa, a significant crop in the region. To address this issue, a comprehensive study was conducted, starting with detailed field inspections to assess the current state of the road. These inspections were followed by a topographic survey, essential for planning the road design. Additionally, an AADT (Average Annual Daily Traffic) analysis was carried out to determine the volume and type of traffic the road would support. The soil study, conducted through test pits, revealed the physical and mechanical characteristics of the terrain, which are crucial for making decisions about the geometric design of the road and the pavement structure. Technical parameters were defined to ensure functionality and safety for all road users. Moreover, a detailed unit price analysis was prepared to ensure the economic feasibility of the project. The results provided a solid foundation for project implementation. The geometric design includes the optimization of the road layout and structural elements that ensure a safe and efficient infrastructure. This project represents a significant contribution from the Technical University of Ambato, reaffirming its commitment to regional development and community well-being.
  • Item type:Ítem,
    Elaboración de un plan de mejoramiento de la vía que une los sectores de la libertad de la parroquia Huachi Grande con el barrio Condorloma de la parroquia Santa Rosa del cantón Ambato
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08)
    Gavilanes Rivera, Albert Alexander
    ;
    Moya Medina, Dilon Germán
    Adequate road infrastructure that complies with technical standards is essential to ensure the progress of society and traffic safety. In response to this situation and considering the needs of the GAD Parroquial de Huachi Grande and Santa Rosa, this project aims to propose a comprehensive improvement plan for the road linking these two parishes, since the current conditions do not guarantee the required safety and efficiency. For this purpose, a topographic survey was carried out with RTK equipment and a study of vehicular traffic. Subsequently, soil studies were carried out based on standards, thus establishing the physical and mechanical properties. This was followed by the improvement plan, which consisted of a geometric design of the road, as well as the calculation of the pavement structure, information necessary to prepare a referential budget and schedule. As a result, a road length of 4+640.89 km was defined, in addition to a future TPDA of 2687 vehicles/day for a design period of 20 years, classifying this road as class II. Subsequently, a design CBR of 13.35 percent is highlighted, which defined the soil as fair to good for use in subgrade. In addition, thicknesses of 7.5 cm were calculated for the asphalt binder, 15 cm for the base and 20 cm for the subbase. Finally, an economic analysis was carried out to obtain a budget for the implementation of the project of $1,514,594.25 and a time frame of 24 weeks.
  • Item type:Ítem,
    Mejoramiento de la vía Palopo Centro-Palopo Mirador de la parroquia Ignacio Flores del cantón Latacunga
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2022-03)
    Tapia Villamarin, Mary Carmen
    ;
    Aldás Sánchez, Milton Rodrigo
    The project was developed in order to carry out the study for the improvement of the Palopo Centro-Palopo Mirador road, which will favor the economic and social development of the inhabitants of the sector. The development of this project consists of the topographic survey for which the total station was used; the vehicular traffic count with which the projected TPDA will last for 20 years; the study of the soil where the granulometry, the liquid and plastic indices and the punctual CBR will be reduced to subsequently calculate the design CBR that will be able to design the pavement structure. In addition, the geometric design of the road was carried out according to the specifications of the MOP and the reference budget of the project. At the end of the project, it will be delivered to the Municipal GAD of the Latacunga canton, as a contribution from the Technical University of Ambato for the community, which can be used in the way it sees fit.