Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 1 de 1
  • Item type:Ítem,
    Diseño de la red de alcantarillado sanitario para los sectores de Bellavista y Langasa, del cantón Salcedo, de la provincia de Cotopaxi
    (Ingeniería Civil y Mecánica. Carrera Ingeniería Civil, 2025)
    Cruz Obando. Jose Francisco
    ;
    Maldonado Narváez Lenin Rafael
    The proper management of wastewater through sanitary sewer systems is essential for safeguarding public health and preserving the environment. However, several areas within the Salcedo Canton, located in Cotopaxi Province, still face deficiencies in the coverage of this basic service. In this context, the primary objective of the present project was to design a sanitary sewer network for the sectors of Bellavista and Langasa. The technical proposal was developed in three methodological phases. In the first stage, preliminary studies were conducted, including a high-precision topographic survey, the implementation of structured surveys among local residents, and an analysis of water consumption. The second phase involved the hydraulic design of the system, carried out in accordance with the “SENAGUA” regulations and the “Bolivian Standard NB 688,” as well as the criteria outlined in the “Standards for the Study and Design of Potable Water and Wastewater Disposal Systems for Populations Over 1000 Inhabitants.” This phase included the calculation of flow rates, velocities, slopes, and pipe diameters, ensuring the appropriate sizing of each component. The final phase focused on the economic evaluation to determine the investment required for project execution. The proposed design includes a network consisting of 63 inspection manholes and 62 pipeline segments, totaling an approximate length of 3.37 kilometers. Additionally, the operational capacity of the wastewater treatment plant “Jesús del Gran Poder,” located in the eastern sector, was assessed. It was found to be partially in acceptable condition; however, deficiencies in specific components were identified, which compromise its efficiency in handling the projected flow rate of 2.82 L/s. Based on these findings, it is concluded that some components of the existing infrastructure require redesign and corrective maintenance in accordance with the applicable technical standards. Furthermore, the total budget estimated for the implementation of the project amounts to $260,030.97, including materials, labor, and other necessary resources.