Ingeniería Civil y Mecánica

URI permanente para esta comunidadhttp://repositorio.uta.edu.ec/handle/123456789/898

Examinar

Resultados de la búsqueda

Mostrando 1 - 1 de 1
  • Item type:Ítem,
    Optimización de la red de distribución de agua potable del sector Cruz de Mayo de la junta regional Nueva Vida, cantón Quero, provincia de Tungurahua
    (Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil, 2026-01-14)
    Arroba Sánchez Kevin Giovanni
    ;
    Soria Pugo María Gabriela
    ;
    Universidad Técnica de Ambato-Facultad de Ingeniería Civil y Mecánica-Carrera de Ingeniería Civil
    The present degree work was carried out in the Cruz de Mayo neighborhood, located in the Quero canton, in the province of Tungurahua. The potable water distribution system currently operating in this sector was built approximately 40 years ago, without prior technical studies or formal planning processes. Initially, the infrastructure was designed solely to supply the Cruz de Mayo and San Antonio neighborhoods; however, over time it was expanded empirically to also provide water to the Yayulihui neighborhood. In the specific case of Cruz de Mayo, the system serves 143 users, which has generated operational limitations: excessively high pressures in the final sections, low pressures in critical points, reduced velocities that promote sedimentation, and in general, a performance that does not respond to the current demographic growth. These conditions justify the need to optimize the system, and this project represents the first technical step toward achieving it. To address this, information was collected regarding the physical and operational conditions of the main components: the chlorination tank, storage tank, pipeline network, pressurereducing tanks, and valves. This assessment made it possible to identify natural infrastructure deterioration and the points where system operation is compromised. Additionally, a topographic survey was carried out through photogrammetry, enabling the generation of a 4.3 km² surface model and the georeferencing of system elements and household connections. The hydraulic parameters required for modeling were also compiled, including pipeline diameters and layout through field inspections, and demands obtained from monthly consumption records. With this information, a hydraulic model of the existing system was developed using WaterCAD software, allowing for an evaluation of its real performance. The results show that only 59.46% of the nodes operate within the normative pressure range, and only 8.89% of the pipes present adequate velocities, confirming the need for technical intervention. Based on this diagnosis, two optimization alternatives were proposed. The first maintains most of the existing infrastructure and intervenes only in the most critical sectors, achieving an optimization of 37.31% of the system. This proposal significantly improves hydraulic parameters, reaching 90.48% of nodes within the normative range and 32% of pipes operating with adequate velocities. The second alternative proposes a redesign of the layout, relocating the network towards public roads in accordance with current regulations. This approach xviii requires intervening 85.86% of the system and results in 92.86% of nodes within the permitted pressure range and 38.78% of pipes operating at adequate velocities.