  • Item type:Ítem,
    Diseño del sistema de captación, conducción y almacenamiento de cuatro fuentes hídricas pertenecientes a la comunidad de Tiliví ubicado en la Parroquia Pasa, Provincia Tungurahua
    (Ingeniería Civil y Mecánica. Carrera Ingeniería Civil, 2025)
    Pico Ruíz Valeria Lissette
    ;
    Castro Solorzano Fidel Alberto
    The objective of this thesis is to design a system for collecting, conveying, storing, and purifying water from four natural springs located in the community of Tiliví, Pasa parish, Tungurahua province, in order to optimize the use of water resources for human consumption. It was carried out in three phases: georeferencing of water sources, design of the collection system, and proposal for a purification plant with the structural design of the plant. A quantitative and qualitative methodology was used, carried out in three phases: topographic survey using RTK technology, flow measurement using the volumetric method for 30 days, and physical-chemical and microbiological analysis of the water, in accordance with INEN 2200. The results determined that the springs have sufficient average flow rates for supply (notably the slope 4 spring with 2.48 L/s), although microbiological contamination was detected in at least one source, justifying the design of a purification system with reverse osmosis, UV radiation, and ozonation. Finally, a storage tank and a plant with metal profiles and concrete elements were structurally designed, complying with AISC 360-16 and NEC standards. It is concluded that the proposed system is technically and structurally viable and represents a sustainable solution that improves access to safe water, boosts the local economy, and can be replicated in other rural communities in the country
  • Item type:Ítem,
    Desarrollo de un plan de mantenimiento basado en el mantenimiento productivo total (TPM) para el sistema de captación, conducción y casa de máquinas en la central hidroeléctrica Río Verde Chico
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Mecánica, 2021-01)
    Casco Andrade, Christian Andrés
    ;
    López Velástegui, Jorge Enrique
    The present project determined a mechanical maintenance plan based on the TPM for the catchment, conduction and machine house system at the Río Verde Chico hydroelectric plant of the company HIDROSIERRA SA, in the city of Baños de Agua Santa, the development of the plan maintenance began with the collection and information gathering of the mechanical elements that intervene in the three systems previously obtained for the subsequent obtaining of technical sheets of each mechanical element and their respective coding. The constant titling work with five of the twelve steps established by the Japanese Plant Maintenance Institute (JIPM) for the implementation of Total Productive Maintenance (TPM), in addition to obtaining the preventive maintenance ranges, techniques established by the Reliability Centered Maintenance (RCM), such as Modal Failure and Effects Analysis (AMFE) and Criticality Analysis (CA), all for the generation of the maintenance plan. In addition, it includes the 5 “S” strategy, named after its initials in Japanese, the implementation of this strategy began with the identification and classification of elements, by means of the red labeling, the useful elements were relocated in the storage areas and for the non-useful elements were delivered to the qualified managers for their purpose or, in the case of garbage, to the garbage collectors controlled by the Illustrious Municipality of Baños, with the application of this strategy, we sought to create a cleaner, more orderly work environment and sure.