Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Zavala Salazar, Joselyn Valeria"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Actualización del Manual de Buenas Prácticas de Manufacturas (BPM) para la empresa INDUNEVALL de la parroquia Totoras - cantón Ambato
    (Universidad Técnica de Ambato. Facultad de Ciencia e Ingeniería en Alimentos y Biotecnología. Carrera de Alimentos, 2022-09) Zavala Salazar, Joselyn Valeria; Ortiz Escobar, Jacqueline de las Mercedes
    This final curricular integration report was focused on the development of a Manual of Good Manufacturing Practices in order to implement it and achieve GMP certification for the INDUNEVALL company located in the Totoras town, Ambato city, which is dedicated to the elaboration and commercialization of chochos and mote pasteurized with salt. The initial diagnosis of the company was done through the verification guidance FI-B.5.1.3-ALI-02-02. Well proportioned by the ARCSA which is part of 212 items with 3 levels of evaluation each one. According to this, it was obtained that the company in its current conditions presents 58.02 percent of breach; 33.49 percent of compliance and 8.49 percent of a parameters not applicable to the Company’s activities. The Standardized Operating and Sanitation Procedures were developed based on the nonconformities detected and the requirements established in ARCSA resolution 067 and contains programs, registers and corrective actions, these procedures will allow maintaining adequate hygienic conditions throughout the production process and guarantee the quality and safety of the products. The action plan as the same as the schedule have been prepared with a clear projection to overcoming the nonconformities in an appropriate period of time and according to the resources that the Company has available. All of this is with the purpose to obtain the BPM certificate.

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify