Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Culqui Llamuca, Giovanna Lissette"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Evaluación del funcionamiento de la planta de tratamiento de aguas residuales del sector Tres Esquinas de la parroquia Presidente Urbina, perteneciente al cantón Santiago de Píllaro, provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2023-03) Culqui Llamuca, Giovanna Lissette; Guevara Robalino, Jorge Javier
    At present, a serious environmental impact has been observed due to the discharge of wastewater without prior treatment or without adequate sanitation, in order to know if the wastewater treatment plant (PTAR) in the Tres Esquinas sector currently works correctly or has reduced its efficiency in the removal of contaminants, an information survey was carried out in the field, where the maximum flow rates at the entrance and exit of the plant were determined, resulting in 2.40 liters/sec in the tributary and 2.02 liters/sec in the effluent, and thus obtain residual water samples for subsequent laboratory analysis. With the laboratory results and their respective dimensions, the operation of the plant components was evaluated, which are: flow distribution tank, septic tank, ascending flow anaerobic filter (FAFA) and sludge drying bed, demonstrating in mostly the correct operation of the WWTP compared to design manuals; adding that the values of the parameters of the wastewater effluent are less than the maximum values stipulated in the TULSMA 2015 standard. As a result, and to improve the performance of the WWTP, a resizing of the septic tank is proposed, the only component that did not comply with the sizing based on the RAS 2000 standard, additionally an operation and maintenance plan for it is presented, the design of an enclosure and a cover for the sludge drying bed with their respective plans and referential budget.

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify