dc.descriptionEn el siguiente proyecto de investigación se realizó la planificación y control constructivo del Bloque de Aulas de una Unidad Educativa del Milenio estándar, empleando metodología BIM (Building Information Modeling), mediante la construcción de un modelo virtual de información y su proceso de creación hasta llegar a una simulación que permita comprobar gráficamente el avance del proyecto de acuerdo al cronograma establecido, para que de esta manera se lleve un control del avance obra a la par con la realidad, que inicia en su fase estructural y culmina en la fase de detalles de acabados. Se utilizó Autodesk Revit para modelar estructura, encofrados, arquitectura, instalaciones hidrosanitarias e instalaciones eléctricas, lo cual permitió extraer planos constructivos y obtener cantidades de obra tanto generales como por sectores. El modelo BIM no solo genera una visualización actualizada de los cambios en el diseño de la edificación, también permitió llevar a cabo una pre-construcción virtual, mediante una planificación adecuada para simular su construcción, asociando sus elementos al rubro que conforma el presupuesto con su correspondiente costo, llegando a un nivel BIM 5D. Para realizar la coordinación entre especialidades y simulación 4D/5D, el modelo 3D se exportó a Autodesk Navisworks, se crearon sets de selección y se asociaron al cronograma elaborado en MS Project. Durante la comprobación de volúmenes de obra procedentes de planos estructurales previamente elaborados en CAD 2D con los obtenidos del modelo BIM, se encontró un margen de error bajo en elementos de hormigón y estructura metálica por lo que obtener cantidades de obra a partir del modelo ahorra tiempo, modelar todas las especialidades minimiza deficiencias y aumenta productividad en un ambiente colaborativo.es_ES
dc.description.abstractIn the next research project the planning and constructive control of the Classroom Block of a Standard Millennium Educational Unit was carried out, using the BIM (Building Information Modeling) methodology, through the construction of a virtual information model and its creation process until arriving to a simulation that allows to check graphically the progress of the project according to the established schedule so that in this way a control of the progress is being carried out working at the same time with the reality, that begins in its structural phase and culminates in the finishing details phase Autodesk Revit was used to model structure, formwork, architecture, hydro-sanitary installations and electrical installations, which allowed to extract constructive drawings and obtain quantities of work both general and by sectors. The BIM model does not only generates an updated visualization of the changes in the design of the building, it also allows to carry out a virtual pre-construction, through an adequate planning to simulate its construction, associating its elements to the item that makes up the budget with its corresponding cost, reaching a level BIM 5D. To carry out the coordination between specialties and 4D / 5D simulation, the 3D model was exported to Autodesk Navisworks, selection sets were created and associated with an elaborated schedule in the MS Project. During the verification of volumes of work from structural drawings previously prepared in 2D CAD with those obtained from the BIM model, a low margin of error was found in concrete elements and metal structure, so obtaining quantities of work from the model saves time, modeling all specialties minimizes deficiencies and increases productivity in a collaborative environment.es_ES
dc.language.isospaes_ES
dc.publisherUniversidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica. Carrera de Ingeniería Civiles_ES
dc.rightsopenAccesses_ES
dc.subjectCONSTRUCCIÓNes_ES
dc.subjectPROGRAMAS DE COMPUTADORes_ES
dc.subjectAVANCE DE OBRAes_ES
dc.subjectPLANIFICACIÓN DE CONSTRUCCIÓNes_ES
dc.subjectINSTALACIONES HIDROSANITARIASes_ES
dc.subjectINSTALACIONES ELÉCTRICASes_ES
dc.titlePlanificación y control constructivo de una edificación aplicando metodología BIMes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Tesis 1245 - Granja Parra Gustavo Patricio.pdf113,99 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.