Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uta.edu.ec/jspui/handle/123456789/8546
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorReyes Vásquez, John Paúl-
dc.contributor.authorÁlvarez Rojas, Kevin Marcelo-
dc.date.accessioned2015-02-05T21:51:26Z-
dc.date.available2015-02-05T21:51:26Z-
dc.date.issued2014-11-
dc.identifier.othert941id-
dc.identifier.urihttp://repositorio.uta.edu.ec/handle/123456789/8546-
dc.descriptionSublínea de investigación: Gestión de sistemas de planeación y control de la producción de bienes industrialeses_ES
dc.description.abstractRESUMEN El proyecto de investigación se centra en elaborar el modelo TAMBOR – AMORTIGUADOR – CUERDA de la Teoría de las Restricciones ya que la empresa Calzado Gamo´s tiene gran cantidad de inventario en sus bodegas de materia prima. Se identifica a la demanda del mercado como la restricción propia del sistema para el desarrollo del plan de producción (tambor) con lo que se nivela el flujo, a continuación se agrega los materiales a la bodega central de materia prima y se establece los niveles óptimos de amortiguamiento de inventario los cuales se revisa periódicamente a través de la gerencia dinámica de amortiguadores y al final se ahoga la liberación de materiales (cuerda). El inventario se gerencia con el sistema de colores de prioridades azul (sobre stock), verde (inventario óptimo), amarillo (prevención), rojo (inventario bajo) y negro (venta perdida) y se logra reducir en 100%, 92,87% y 13,07% la zona negro, rojo y azul respectivamente y se aumenta en 5,14 y 1,14 veces las zonas verde y amarillo respectivamente. El ahorro anual de dinero en inventario es de 124.016,47 dólares americanos. ABSTRACT The research project focuses on elaborate the model DRUM - BUFFER - ROPE application of Theory of Constraints because the company Gamo´s have lot of inventory in their warehouses feedstock. First identified market demand as their own constraint system for the development of the master production schedule (drum), with this the flow is leveled, then the materials are added to the central warehouse feedstock and optimal levels of buffering are set, the buffers are reviewed periodically with dynamic buffer management and finally the release of materials (rope) drowns. The inventory management system is with priority colors: blue (excess stock), green (optimal inventory), yellow (prevention), red (low stock) and black (lost sale) and will reduce 100%, 92.87% and 13.07% the black, red and blue areas respectively and increased 5.14 and 1.14 times the green and yellow areas respectively. Saving money in inventory is U.S. $ 124,016.47.es_ES
dc.language.isospaes_ES
dc.publisherUniversidad Técnica de Ambato. Facultad de Ingeniería en Sistemas, Electrónica e Industrial. Carrera de Ingeniería Industrial en Procesos de Automatizaciónes_ES
dc.relation.ispartofseriesBFISEI;t941id-
dc.rightsopenAccess-
dc.subjectDEMANDAes_ES
dc.subjectMATERIA PRIMAes_ES
dc.subjectTEORÍA DE RESTRICCIONESes_ES
dc.subjectEMPRESAS DE CALZADOes_ES
dc.titleModelo TAC (Tambor - Amortiguador - Cuerda) para el abastecimiento de materia prima en la Empresa Calzado Gamo'ses_ES
dc.typebachelorThesises_ES
Aparece en las colecciones: Tesis Ingeniería Industrial Procesos de Automatización

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Tesis_t941id.pdf9,68 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.