Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Vásquez Ortega, Carlos Daniel"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Diseño geométrico de la vía que une a la colonia San Miguel de LLandia – Las Magdalenas pertenecientes a la parroquia Teniente Hugo Ortiz, cantón Pastaza, provincia de Pastaza
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2021-03) Vásquez Ortega, Carlos Daniel; Moya Medina, Dilon Germán
    For the development of this project, a study and direct observation was carried out in order to determine the current conditions of the terrain where the road is going to be made. Then it was socialized with the inhabitants of the sector applying a tentative and previous route of the same. Later the topographic study was continued in which the horizontal, vertical and transversal geometric design of the road with its respective sections of road, mass volumes, ditches and culverts were carried out. Then the study of soils was elaborated. This project was carried out under the norm (MOP-2003), which currently governs as the Ministry of Transportation and Public Works (MTOP) and the Annual Average Daily Traffic (TPDA), was determined by means of manual counting for a period of 12 hours and 7 days. This data was used to determine the number of vehicles passing and AASHTO method was used for 30 hours to determine the traffic projected in the future. Finally, the calculation of the volume of cut and fill mass was carried out, with which it was determined: the analysis of unit prices, referential budget, a valued work schedule and the respective Pre-feasibility studies .

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify