Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Caiza Caiza, Israel Tupak"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Evaluación de la planta de tratamiento de las aguas residuales del sector Cruz Huayco de la parroquia Juan Benigno Vela del cantón Ambato de la provincia de Tungurahua
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-02) Caiza Caiza, Israel Tupak; Morales Fiallos, Fabián Rodrigo
    The evaluation of the Wastewater Treatment Plant (WWTP) in the Cruz Huayco sector is intended to determine its efficiency and compliance with environmental regulations. The current infrastructure shows signs of deterioration, with treatment capacity close to its limit. The treatment processes have demonstrated acceptable effectiveness, although areas for improvement were identified. Keywords: treatment plant, wastewater, environmental pollution, sludge operation, Cruz Huayco. The maintenance and operational status of the WWTP need immediate attention to ensure its long-term functionality. Studies were observed and carried out regarding environmental regulations, especially regarding contaminant removal levels. Waste and sludge management could be optimized to improve environmental sustainability; Despite these challenges, the WWTP largely complies with environmental regulations. Specific improvements are suggested to optimize operating costs and ensure long-term functionality. In summary, the WWTP demonstrates efficiency, but requires immediate attention in some areas vital to its operation. Detailed recommendations are provided to address identified issues, prioritizing actions to improve operational efficiency and comply with environmental regulations.

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify