Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Benavides Manjarrés, Jennifer Anahí"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • No Thumbnail Available
    Item
    Diseño del sistema de alcantarillado sanitario y su planta de tratamiento de aguas residuales de la comunidad de Valle del Palmar del cantón Huamboya, provincia de Morona Santiago, para mejorar la calidad de vida de los moradores del sector.
    (Universidad Técnica de Ambato. Facultad de Ingeniería Civil y Mecánica, Carrera de Ingeniería Civil, 2024-08) Benavides Manjarrés, Jennifer Anahí; Moya Medina, Dilon Germán
    The Huamboya canton lacks sanitation systems in several communities, which affects the health of its inhabitants; therefore, it is very necessary to have an adequate sewerage system to improve their living conditions. This project includes several stages to ensure an adequate design, starting with a topographic survey to determine slopes and elevations. Subsequently, design parameters were estimated in order to determine the sizing and layout of the pipes, the strategic location of the wells, compliance with hydraulic gradients and flow velocities by applying engineering methods based on current standards such as Bolivian Standard NB-688 and SENAGUA, surveys were also conducted to learn about the characteristics of the population and a study of water consumption patterns in the canton, the design of the treatment plant considering its proper operation and environmental impact, under an analysis of the quality of local wastewater. An economic study was included with a detailed analysis of unit prices, technical specifications and the corresponding schedule. The sewage system design was obtained with a total number of 29 wells, of which 4 are skip wells and 31 pipes, and the referential budget is USD 255,830.37 ctvs. In this work the results and products obtained are shown in detail in the technical drawings elaborated in the following pages.

DSpace software copyright © 2002-2025 LYRASIS

  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify